IAC Assessment: WV0515
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2015
Principal Product Metal Finishing
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 20,000
Annual Production 8,000,000 Pounds
Production Hrs. Annual 3,952
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,676 590,740 kWh $0.11
Electricity Demand $14,595 2,112 kW-months/year $6.91
Natural Gas $107,288 19,293 MMBtu $5.56
TOTAL ENERGY COSTS $187,559
RECOMMENDED SAVINGS* $32,832 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,552
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2123 INSULATE FEEDWATER TANK Savings:
$13,405
Cost:
$6,253
- - - - $13,405 2,411 - - -
-
kWh
-
-
kW-months/year
$13,405
2,411
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,569
Cost:
$1,700
- - - - $4,954 891 $(-385) - -
-
kWh
-
-
kW-months/year
$4,954
891
MMBtu
$(-385)
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,682
Cost:
$1,278
$3,914 35,199 $768 111 - - - - $3,914
35,199
kWh
$768
111
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$4,181
Cost:
$11,220
- - - - $4,181 752 - - -
-
kWh
-
-
kW-months/year
$4,181
752
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,835
Cost:
$920
$1,544 13,884 $291 42 - - - - $1,544
13,884
kWh
$291
42
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,694
Cost:
$6,400
$1,424 12,806 $270 39 - - - - $1,424
12,806
kWh
$270
39
kW-months/year
-
-
MMBtu
-
-
$
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,310
Cost:
$1,175
$1,206 10,841 $104 15 - - - - $1,206
10,841
kWh
$104
15
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$975
Cost:
$3,180
$795 7,148 $180 26 - - - - $795
7,148
kWh
$180
26
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$181
Cost:
$35
$153 1,379 $28 4 - - - - $153
1,379
kWh
$28
4
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,832
Cost:
$32,161
$9,036 81,257 $1,641 237 $22,540 4,054 $(-385) - $9,036
81,257
kWh
$1,641
237
kW-months/year
$22,540
4,054
MMBtu
$(-385)
-
$
TOTAL IMPLEMENTED Savings:
$13,552
Cost:
$8,288
$7,612 68,451 $1,371 198 $4,954 891 $(-385) - $7,612
68,451
kWh
$1,371
198
kW-months/year
$4,954
891
MMBtu
$(-385)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes