IAC Assessment: WV0517
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0517
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2016
Principal Product Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 126
Plant Area (Sq.Ft.) 40,000
Annual Production 18,000 Thousand Feet
Production Hrs. Annual 2,678
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $314,377 9,466,174 kWh $0.03
Electricity Demand $432,504 28,229 kW-months/year $15.32
Wood $91,250 58,400 MMBtu $1.56
TOTAL ENERGY COSTS $838,131
RECOMMENDED SAVINGS* $57,510 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,142
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Personnel Changes Electricity Usage Electricity Demand Wood Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$22,825
Cost:
$54,000
- - - - $22,825 14,608 - - -
-
kWh
-
-
kW-months/year
$22,825
14,608
MMBtu
-
-
$
02: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$7,474
Cost:
$1,000
$6,716 202,293 $4,351 284 - - $(-3,593) - $6,716
202,293
kWh
$4,351
284
kW-months/year
-
-
MMBtu
$(-3,593)
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$14,320
Cost:
-
$4,668 140,589 $9,652 630 - - - - $4,668
140,589
kWh
$9,652
630
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$5,859
Cost:
$1,478
$1,988 59,890 $4,351 284 - - $(-480) - $1,988
59,890
kWh
$4,351
284
kW-months/year
-
-
MMBtu
$(-480)
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,584
Cost:
$5,000
$2,584 77,845 - - - - - - $2,584
77,845
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,573
Cost:
$450
$439 13,231 $1,134 74 - - - - $439
13,231
kWh
$1,134
74
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,069
Cost:
$260
$1,069 33,207 - - - - - - $1,069
33,207
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$959
Cost:
$1,940
- - - - $959 615 - - -
-
kWh
-
-
kW-months/year
$959
615
MMBtu
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$847
Cost:
$60
$265 7,984 $582 38 - - - - $265
7,984
kWh
$582
38
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$57,510
Cost:
$64,188
$17,729 535,039 $20,070 1,310 $23,784 15,223 $(-4,073) - $17,729
535,039
kWh
$20,070
1,310
kW-months/year
$23,784
15,223
MMBtu
$(-4,073)
-
$
TOTAL IMPLEMENTED Savings:
$31,142
Cost:
$3,248
$15,145 457,194 $20,070 1,310 - - $(-4,073) - $15,145
457,194
kWh
$20,070
1,310
kW-months/year
-
-
MMBtu
$(-4,073)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Wood Personnel Changes Electricity Usage Electricity Demand Wood Personnel Changes