IAC Assessment: WV0520
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0520
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2016
Principal Product Metal Stamping
NAICS 336370 - Motor Vehicle Metal Stamping
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 155,000
Annual Production 20,000,000 Pieces
Production Hrs. Annual 4,940
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,566 1,995,347 kWh $0.05
Electricity Demand $137,369 7,770 kW-months/year $17.68
Natural Gas $17,363 2,221 MMBtu $7.82
TOTAL ENERGY COSTS $255,298
RECOMMENDED SAVINGS* $48,267 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,366
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$32,234
Cost:
$120,094
$17,400 345,247 $14,834 839 - - - - - - $17,400
345,247
kWh
$14,834
839
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,194
Cost:
$11,813
$2,267 44,982 $1,927 109 - - - - - - $2,267
44,982
kWh
$1,927
109
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,037
Cost:
$370
$2,181 43,265 $1,856 105 - - - - - - $2,181
43,265
kWh
$1,856
105
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,924
Cost:
$1,187
- - - - - - $1,924 246 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,924
246
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,776
Cost:
$5,830
- - - - $1,776 - - - - - -
-
kWh
-
-
kW-months/year
$1,776
-
$
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,809
Cost:
$1,589
$960 19,047 $849 48 - - - - - - $960
19,047
kWh
$849
48
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$780
Cost:
$1,156
$639 12,672 $548 31 - - - - $(-407) - $639
12,672
kWh
$548
31
kW-months/year
-
-
$
-
-
MMBtu
$(-407)
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$773
Cost:
$1,420
$419 8,316 $354 20 - - - - - - $419
8,316
kWh
$354
20
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$461
Cost:
$428
$249 4,932 $212 12 - - - - - - $249
4,932
kWh
$212
12
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$279
Cost:
$384
$191 3,785 $88 5 - - - - - - $191
3,785
kWh
$88
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$48,267
Cost:
$144,271
$24,306 482,246 $20,668 1,169 $1,776 - $1,924 246 $(-407) - $24,306
482,246
kWh
$20,668
1,169
kW-months/year
$1,776
-
$
$1,924
246
MMBtu
$(-407)
-
$
TOTAL IMPLEMENTED Savings:
$7,366
Cost:
$3,927
$4,220 83,701 $3,553 201 - - - - $(-407) - $4,220
83,701
kWh
$3,553
201
kW-months/year
-
-
$
-
-
MMBtu
$(-407)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes