IAC Assessment: WV0523
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0523
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2016
Principal Product Sewage Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 82
Plant Area (Sq.Ft.) 1,400,000
Annual Production 1,350,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $311,376 7,047,270 kWh $0.04
Electricity Demand $168,340 13,520 kW-months/year $12.45
Natural Gas $71,839 8,999 MMBtu $7.98
TOTAL ENERGY COSTS $551,555
RECOMMENDED SAVINGS* $80,947 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,531
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$51,512
Cost:
$200,000
$37,170 840,960 $14,342 1,152 - - - - $37,170
840,960
kWh
$14,342
1,152
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,250
Cost:
$51,000
$13,250 299,776 - - - - - - $13,250
299,776
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,412
Cost:
$4,664
$3,906 88,371 $1,506 121 - - - - $3,906
88,371
kWh
$1,506
121
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,867
Cost:
$2,686
$3,513 79,452 $1,354 109 - - - - $3,513
79,452
kWh
$1,354
109
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,819
Cost:
$1,235
$2,247 50,826 $872 70 - - $(-300) - $2,247
50,826
kWh
$872
70
kW-months/year
-
-
MMBtu
$(-300)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,279
Cost:
$4,985
$632 14,296 $647 52 - - - - $632
14,296
kWh
$647
52
kW-months/year
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,154
Cost:
$500
- - - - $1,229 154 $(-75) - -
-
kWh
-
-
kW-months/year
$1,229
154
MMBtu
$(-75)
-
$
08: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$654
Cost:
$2,700
- - - - $654 82 - - -
-
kWh
-
-
kW-months/year
$654
82
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$80,947
Cost:
$267,770
$60,718 1,373,681 $18,721 1,504 $1,883 236 $(-375) - $60,718
1,373,681
kWh
$18,721
1,504
kW-months/year
$1,883
236
MMBtu
$(-375)
-
$
TOTAL IMPLEMENTED Savings:
$15,531
Cost:
$14,070
$10,298 232,945 $4,379 352 $1,229 154 $(-375) - $10,298
232,945
kWh
$4,379
352
kW-months/year
$1,229
154
MMBtu
$(-375)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes