IAC logo
IAC Assessment: WV0524
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0524
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2016
Principal Product Purchased Glass
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 250,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 5,100
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $337,521 8,828,952 kWh $0.04
Electricity Demand $342,804 22,375 kW-months/year $15.32
Natural Gas $14,632 2,208 MMBtu $6.63
TOTAL ENERGY COSTS $694,957
RECOMMENDED SAVINGS* $52,794 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,010
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,329
Cost:
$30,168
$15,606 408,525 $14,723 961 - - - - $15,606
408,525
kWh
$14,723
961
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,145
Cost:
$3,264
- - - - $5,145 776 - - -
-
kWh
-
-
kW-months/year
$5,145
776
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,286
Cost:
$65
$2,202 57,650 $2,084 136 - - - - $2,202
57,650
kWh
$2,084
136
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,003
Cost:
$305
$1,548 40,519 $1,455 95 - - - - $1,548
40,519
kWh
$1,455
95
kW-months/year
-
-
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,321
Cost:
$3,148
- - - - $2,321 350 - - -
-
kWh
-
-
kW-months/year
$2,321
350
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,139
Cost:
$10,151
$867 22,706 $1,272 83 - - - - $867
22,706
kWh
$1,272
83
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,984
Cost:
$1,080
$1,155 30,229 $1,088 71 - - $(-259) - $1,155
30,229
kWh
$1,088
71
kW-months/year
-
-
MMBtu
$(-259)
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,870
Cost:
$756
- - - - $1,870 282 - - -
-
kWh
-
-
kW-months/year
$1,870
282
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,448
Cost:
$1,208
$743 19,453 $705 46 - - - - $743
19,453
kWh
$705
46
kW-months/year
-
-
MMBtu
-
-
$
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$269
Cost:
$370
$269 7,032 - - - - - - $269
7,032
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$52,794
Cost:
$50,515
$22,390 586,114 $21,327 1,392 $9,336 1,408 $(-259) - $22,390
586,114
kWh
$21,327
1,392
kW-months/year
$9,336
1,408
MMBtu
$(-259)
-
$
TOTAL IMPLEMENTED Savings:
$42,010
Cost:
$42,139
$21,647 566,661 $20,622 1,346 - - $(-259) - $21,647
566,661
kWh
$20,622
1,346
kW-months/year
-
-
MMBtu
$(-259)
-
$