IAC logo
IAC Assessment: WV0527
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0527
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2016
Principal Product Fabricated Metal
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 61
Plant Area (Sq.Ft.) 75,000
Annual Production 1,200 Tons
Production Hrs. Annual 5,516
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,738 1,309,500 kWh $0.07
Electricity Demand $34,422 4,305 kW-months/year $8.00
Natural Gas $28,605 2,718 MMBtu $10.52
TOTAL ENERGY COSTS $155,765
RECOMMENDED SAVINGS* $32,457 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,420
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$13,053
Cost:
$54,000
$7,901 111,601 $5,152 644 - - - - $7,901
111,601
kWh
$5,152
644
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,539
Cost:
$1,100
- - - - $4,629 440 $(-90) - -
-
kWh
-
-
kW-months/year
$4,629
440
MMBtu
$(-90)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,268
Cost:
$2,530
$4,060 57,347 $208 26 - - - - $4,060
57,347
kWh
$208
26
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,255
Cost:
$6,300
$(-38) (-536) - - $3,293 313 - - $(-38)
(-536)
kWh
-
-
kW-months/year
$3,293
313
MMBtu
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,540
Cost:
$4,500
$2,540 35,878 - - - - - - $2,540
35,878
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,524
Cost:
$60
$1,220 17,233 $304 38 - - - - $1,220
17,233
kWh
$304
38
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,189
Cost:
$283
- - - - $1,189 113 - - -
-
kWh
-
-
kW-months/year
$1,189
113
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,044
Cost:
$165
$836 11,801 $208 26 - - - - $836
11,801
kWh
$208
26
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$581
Cost:
$1,275
$469 6,622 $112 14 - - - - $469
6,622
kWh
$112
14
kW-months/year
-
-
MMBtu
-
-
$
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$252
Cost:
$263
- - - - $252 24 - - -
-
kWh
-
-
kW-months/year
$252
24
MMBtu
-
-
$
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$212
Cost:
$527
$268 3,785 $64 8 - - $(-120) - $268
3,785
kWh
$64
8
kW-months/year
-
-
MMBtu
$(-120)
-
$
TOTAL RECOMMENDED Savings:
$32,457
Cost:
$71,003
$17,256 243,731 $6,048 756 $9,363 890 $(-210) - $17,256
243,731
kWh
$6,048
756
kW-months/year
$9,363
890
MMBtu
$(-210)
-
$
TOTAL IMPLEMENTED Savings:
$12,420
Cost:
$5,920
$6,853 96,788 $896 112 $4,881 464 $(-210) - $6,853
96,788
kWh
$896
112
kW-months/year
$4,881
464
MMBtu
$(-210)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes