IAC Assessment: WV0530
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0530
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2016
Principal Product Vinyl Extrusion
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 154
Plant Area (Sq.Ft.) 196,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 8,568
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $996,946 24,572,128 kWh $0.04
Electricity Demand $640,270 55,575 kW-months/year $11.52
Electricity Fees $6,000 - $ -
Natural Gas $6,393 990 MMBtu $6.46
TOTAL ENERGY COSTS $1,649,609
RECOMMENDED SAVINGS* $165,764 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $142,357
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$45,649
Cost:
$8,838
$32,666 804,578 $12,983 1,127 - - - - $32,666
804,578
kWh
$12,983
1,127
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$44,558
Cost:
$72,000
$31,886 785,367 $12,672 1,100 - - - - $31,886
785,367
kWh
$12,672
1,100
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,714
Cost:
$16,453
$16,252 400,305 $6,462 561 - - - - $16,252
400,305
kWh
$6,462
561
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$15,987
Cost:
$1,000
$14,719 362,534 $5,852 508 - - $(-4,584) - $14,719
362,534
kWh
$5,852
508
kW-months/year
-
-
MMBtu
$(-4,584)
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$8,519
Cost:
$1,125
$6,369 156,866 $2,534 220 - - $(-384) - $6,369
156,866
kWh
$2,534
220
kW-months/year
-
-
MMBtu
$(-384)
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,493
Cost:
$128
$6,074 149,602 $2,419 210 - - - - $6,074
149,602
kWh
$2,419
210
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,845
Cost:
$5,000
$4,898 120,647 $1,947 169 - - - - $4,898
120,647
kWh
$1,947
169
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,395
Cost:
$27,920
- - - - $6,395 990 - - -
-
kWh
-
-
kW-months/year
$6,395
990
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,409
Cost:
$1,036
$3,153 77,659 $1,256 109 - - - - $3,153
77,659
kWh
$1,256
109
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,195
Cost:
$8,450
$1,573 38,745 $622 54 - - - - $1,573
38,745
kWh
$622
54
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$165,764
Cost:
$141,950
$117,590 2,896,303 $46,747 4,058 $6,395 990 $(-4,968) - $117,590
2,896,303
kWh
$46,747
4,058
kW-months/year
$6,395
990
MMBtu
$(-4,968)
-
$
TOTAL IMPLEMENTED Savings:
$142,357
Cost:
$112,777
$105,147 2,589,835 $41,794 3,628 - - $(-4,584) - $105,147
2,589,835
kWh
$41,794
3,628
kW-months/year
-
-
MMBtu
$(-4,584)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes