IAC Assessment: WV0531
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0531
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2016
Principal Product Metal Heat Treating
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $1,000,000-$5,000,000
# of Employees 18
Plant Area (Sq.Ft.) 27,500
Annual Production 12,000,000 Pounds
Production Hrs. Annual 5,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,251 1,191,000 kWh $0.08
Electricity Demand $24,054 3,948 kW-months/year $6.09
Electricity Fees $240 - $ -
Natural Gas $125,939 41,487 MMBtu $3.04
TOTAL ENERGY COSTS $260,864
RECOMMENDED SAVINGS* $74,938 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,105
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$19,064
Cost:
$33,000
- - - - $19,064 6,271 - - - - -
-
kWh
-
-
kW-months/year
$19,064
6,271
MMBtu
-
-
lb
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$18,039
Cost:
$63,000
$(-438) (-5,534) - - $18,477 6,078 - - - - $(-438)
(-5,534)
kWh
-
-
kW-months/year
$18,477
6,078
MMBtu
-
-
lb
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$12,371
Cost:
$25,305
$3,013 38,090 $518 85 $8,840 2,908 - - - - $3,013
38,090
kWh
$518
85
kW-months/year
$8,840
2,908
MMBtu
-
-
lb
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$11,464
Cost:
$4,100
- - - - $12,303 4,047 - - $(-839) - -
-
kWh
-
-
kW-months/year
$12,303
4,047
MMBtu
-
-
lb
$(-839)
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,942
Cost:
-
$4,473 56,549 $469 77 - - - - - - $4,473
56,549
kWh
$469
77
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,891
Cost:
$8,624
$3,325 42,308 $566 93 - - - - - - $3,325
42,308
kWh
$566
93
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 3.5222 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) Savings:
$2,730
Cost:
$2,795
- - - - - - $2,730 300,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,730
300,000
lb
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,225
Cost:
$4,010
$957 12,096 $268 44 - - - - - - $957
12,096
kWh
$268
44
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
09: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$956
Cost:
$1,000
$1,954 24,697 $335 55 - - - - $(-1,333) - $1,954
24,697
kWh
$335
55
kW-months/year
-
-
MMBtu
-
-
lb
$(-1,333)
-
$
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$256
Cost:
$649
$330 4,168 $55 9 - - - - $(-129) - $330
4,168
kWh
$55
9
kW-months/year
-
-
MMBtu
-
-
lb
$(-129)
-
$
TOTAL RECOMMENDED Savings:
$74,938
Cost:
$142,483
$13,614 172,374 $2,211 363 $58,684 19,304 $2,730 300,000 $(-2,301) - $13,614
172,374
kWh
$2,211
363
kW-months/year
$58,684
19,304
MMBtu
$2,730
300,000
lb
$(-2,301)
-
$
TOTAL IMPLEMENTED Savings:
$35,105
Cost:
$43,688
$14,052 177,908 $2,211 363 $21,143 6,955 - - $(-2,301) - $14,052
177,908
kWh
$2,211
363
kW-months/year
$21,143
6,955
MMBtu
-
-
lb
$(-2,301)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes