Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2016 |
Principal Product | Fabricated Rubber |
NAICS | 326299 - All Other Rubber Product Manufacturing |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 57,000 |
Annual Production | 9,000,000 Pounds |
Production Hrs. Annual | 4,160 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $143,672 | 2,195,620 | kWh | $0.07 |
Electricity Demand | $152,897 | 11,808 | kW-months/year | $12.95 |
Natural Gas | $39,192 | 9,904 | MMBtu | $3.96 |
TOTAL ENERGY COSTS | $335,761 | |||
RECOMMENDED SAVINGS* | $72,685 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,794 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $35,091 Cost: $2,025 |
$22,335 | 341,512 | $12,756 | 985 | - | - | - | - |
$22,335 341,512 kWh |
$12,756 985 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $15,778 Cost: $25,000 |
$11,712 | 179,075 | $4,066 | 314 | - | - | - | - |
$11,712 179,075 kWh |
$4,066 314 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $7,492 Cost: $18,550 |
- | - | - | - | $7,492 | 1,892 | - | - |
- - kWh |
- - kW-months/year |
$7,492 1,892 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $5,128 Cost: - |
- | - | $5,128 | 396 | - | - | - | - |
- - kWh |
$5,128 396 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,095 Cost: $730 |
- | - | - | - | $2,095 | 529 | - | - |
- - kWh |
- - kW-months/year |
$2,095 529 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,845 Cost: $2,675 |
$1,456 | 22,259 | $389 | 30 | - | - | - | - |
$1,456 22,259 kWh |
$389 30 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,284 Cost: $552 |
$818 | 12,505 | $466 | 36 | - | - | - | - |
$818 12,505 kWh |
$466 36 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $884 Cost: $158 |
$560 | 8,565 | $324 | 25 | - | - | - | - |
$560 8,565 kWh |
$324 25 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $806 Cost: $235 |
$606 | 9,272 | $350 | 27 | - | - | $(-150) | - |
$606 9,272 kWh |
$350 27 kW-months/year |
- - MMBtu |
$(-150) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $811 Cost: - |
$513 | 7,851 | $298 | 23 | - | - | - | - |
$513 7,851 kWh |
$298 23 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $796 Cost: $795 |
$317 | 4,842 | $479 | 37 | - | - | - | - |
$317 4,842 kWh |
$479 37 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $530 Cost: $2,500 |
$336 | 5,131 | $194 | 15 | - | - | - | - |
$336 5,131 kWh |
$194 15 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $145 Cost: $25 |
$93 | 1,418 | $52 | 4 | - | - | - | - |
$93 1,418 kWh |
$52 4 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $72,685 Cost: $53,245 |
$38,746 | 592,430 | $24,502 | 1,892 | $9,587 | 2,421 | $(-150) | - | $38,746 592,430 kWh |
$24,502 1,892 kW-months/year |
$9,587 2,421 MMBtu |
$(-150) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,794 Cost: $5,170 |
$4,363 | 66,712 | $7,486 | 578 | $2,095 | 529 | $(-150) | - | $4,363 66,712 kWh |
$7,486 578 kW-months/year |
$2,095 529 MMBtu |
$(-150) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |