IAC Assessment: WV0537
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2017
Principal Product Poly Ethylene
NAICS 325991 - Custom Compounding of Purchased Resins
SIC 3087 - Custom Compound Purchased Resins
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 51,338
Annual Production 12,400,000 Pounds
Production Hrs. Annual 6,240
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $231,278 2,887,200 kWh $0.08
Electricity Demand $55,681 7,486 kW-months/year $7.44
Electricity Fees $1,800 - $ -
Natural Gas $14,202 2,410 MMBtu $5.89
TOTAL ENERGY COSTS $376,381
RECOMMENDED SAVINGS* $148,037 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,130
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Water Disposal Other Liquid (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Water Usage Water Disposal Other Liquid (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ Tgal $ Tgal $ gal $ $ $ $
01: 3.3121 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS Savings:
$86,765
Cost:
$200,500
- - - - - - - - - - $86,765 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
$86,765
-
$
-
-
$
02: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$18,040
Cost:
$80,000
- - - - - - - - $67,600 676,000 $(-15,760) - $(-33,800) - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
$67,600
676,000
gal
$(-15,760)
-
$
$(-33,800)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,952
Cost:
$7,891
$6,747 84,233 $1,205 162 - - - - - - - - - - $6,747
84,233
kWh
$1,205
162
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$7,934
Cost:
$1,200
$8,351 104,262 $1,562 210 - - - - - - $(-1,979) - - - $8,351
104,262
kWh
$1,562
210
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
$(-1,979)
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,210
Cost:
-
$5,265 65,731 $945 127 - - - - - - - - - - $5,265
65,731
kWh
$945
127
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,093
Cost:
$6,000
$5,170 64,541 $923 124 - - - - - - - - - - $5,170
64,541
kWh
$923
124
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,987
Cost:
$3,105
$2,541 31,717 $446 60 - - - - - - - - - - $2,541
31,717
kWh
$446
60
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,323
Cost:
$2,700
$2,323 29,000 - - - - - - - - - - - - $2,323
29,000
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,291
Cost:
$25
$1,941 24,233 $350 47 - - - - - - - - - - $1,941
24,233
kWh
$350
47
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,909
Cost:
$943
$1,619 20,217 $290 39 - - - - - - - - - - $1,619
20,217
kWh
$290
39
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,706
Cost:
$678
$1,658 20,699 $298 40 - - - - - - $(-250) - - - $1,658
20,699
kWh
$298
40
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
$(-250)
-
$
-
-
$
12: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$1,686
Cost:
$700
- - - - $351 117 $1,404 117 - - $(-69) - - - -
-
kWh
-
-
kW-months/year
$351
117
Tgal
$1,404
117
Tgal
-
-
gal
$(-69)
-
$
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,149
Cost:
$4,400
$859 10,722 $290 39 - - - - - - - - - - $859
10,722
kWh
$290
39
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
14: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$992
Cost:
$631
$843 10,530 $149 20 - - - - - - - - - - $843
10,530
kWh
$149
20
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$148,037
Cost:
$308,773
$37,317 465,885 $6,458 868 $351 117 $1,404 117 $67,600 676,000 $68,707 - $(-33,800) - $37,317
465,885
kWh
$6,458
868
kW-months/year
$351
117
Tgal
$1,404
117
Tgal
$67,600
676,000
gal
$68,707
-
$
$(-33,800)
-
$
TOTAL IMPLEMENTED Savings:
$33,130
Cost:
$18,873
$29,824 372,344 $5,535 744 - - - - - - $(-2,229) - - - $29,824
372,344
kWh
$5,535
744
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
gal
$(-2,229)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ gal $ $ $ $
Electricity Usage Electricity Demand Water Usage Water Disposal Other Liquid (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Water Usage Water Disposal Other Liquid (non-haz) Personnel Changes Administrative Changes