Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2017 |
Principal Product | Water Treatment |
NAICS | 221310 - Water Supply and Irrigation Systems |
SIC | 4941 - Water Supply |
Sales | $1,000,000-$5,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 750,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | MD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $601,139 | 3,986,825 | kWh | $0.15 |
Fuel Oil #1 | $7,900 | 395 | MMBtu | $20.00 |
Fuel Oil #2 | $6,740 | 410 | MMBtu | $16.44 |
TOTAL ENERGY COSTS | $615,779 | |||
RECOMMENDED SAVINGS* | $60,366 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $46,207 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #1 | Fuel Oil #2 | Personnel Changes | Water Consumption | Electricity Usage | Fuel Oil #1 | Fuel Oil #2 | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $20,108 Cost: $1,000 |
$21,458 | 142,295 | - | - | - | - | $(-1,350) | - | - | - |
$21,458 142,295 kWh |
- - MMBtu |
- - MMBtu |
$(-1,350) - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,806 Cost: $6,000 |
$9,806 | 65,026 | - | - | - | - | - | - | - | - |
$9,806 65,026 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $6,105 Cost: $28,500 |
$6,105 | 40,484 | - | - | - | - | - | - | - | - |
$6,105 40,484 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $5,300 Cost: $2,250 |
- | - | - | - | - | - | - | - | $5,300 | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
$5,300 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,530 Cost: $1,622 |
$4,530 | 30,042 | - | - | - | - | - | - | - | - |
$4,530 30,042 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $4,026 Cost: $1,510 |
$4,526 | 30,015 | - | - | - | - | $(-500) | - | - | - |
$4,526 30,015 kWh |
- - MMBtu |
- - MMBtu |
$(-500) - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,896 Cost: $2,445 |
$3,896 | 25,836 | - | - | - | - | - | - | - | - |
$3,896 25,836 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,754 Cost: $8,000 |
$2,754 | 18,261 | - | - | - | - | - | - | - | - |
$2,754 18,261 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $2,926 Cost: $9,400 |
- | - | $1,578 | 79 | $1,348 | 82 | - | - | - | - |
- - kWh |
$1,578 79 MMBtu |
$1,348 82 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $775 Cost: $1,293 |
- | - | $200 | 10 | $575 | 35 | - | - | - | - |
- - kWh |
$200 10 MMBtu |
$575 35 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $140 Cost: $500 |
- | - | $100 | 5 | $115 | 7 | $(-75) | - | - | - |
- - kWh |
$100 5 MMBtu |
$115 7 MMBtu |
$(-75) - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $60,366 Cost: $62,520 |
$53,075 | 351,959 | $1,878 | 94 | $2,038 | 124 | $(-1,925) | - | $5,300 | - | $53,075 351,959 kWh |
$1,878 94 MMBtu |
$2,038 124 MMBtu |
$(-1,925) - $ |
$5,300 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $46,207 Cost: $23,770 |
$44,216 | 293,214 | $1,878 | 94 | $2,038 | 124 | $(-1,925) | - | - | - | $44,216 293,214 kWh |
$1,878 94 MMBtu |
$2,038 124 MMBtu |
$(-1,925) - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #1 | Fuel Oil #2 | Personnel Changes | Water Consumption | Electricity Usage | Fuel Oil #1 | Fuel Oil #2 | Personnel Changes | Water Consumption |