IAC logo
IAC Assessment: WV0538
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0538
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2017
Principal Product Water Treatment
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 50,000
Annual Production 750,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $601,139 3,986,825 kWh $0.15
Fuel Oil #1 $7,900 395 MMBtu $20.00
Fuel Oil #2 $6,740 410 MMBtu $16.44
TOTAL ENERGY COSTS $615,779
RECOMMENDED SAVINGS* $60,366 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,207
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #1 Fuel Oil #2 Personnel Changes Water Consumption Electricity Usage Fuel Oil #1 Fuel Oil #2 Personnel Changes Water Consumption
$ kWh $ MMBtu $ MMBtu $ $ $ Tgal
01: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$20,108
Cost:
$1,000
$21,458 142,295 - - - - $(-1,350) - - - $21,458
142,295
kWh
-
-
MMBtu
-
-
MMBtu
$(-1,350)
-
$
-
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,806
Cost:
$6,000
$9,806 65,026 - - - - - - - - $9,806
65,026
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$6,105
Cost:
$28,500
$6,105 40,484 - - - - - - - - $6,105
40,484
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
Tgal
04: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$5,300
Cost:
$2,250
- - - - - - - - $5,300 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
$5,300
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,530
Cost:
$1,622
$4,530 30,042 - - - - - - - - $4,530
30,042
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
Tgal
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,026
Cost:
$1,510
$4,526 30,015 - - - - $(-500) - - - $4,526
30,015
kWh
-
-
MMBtu
-
-
MMBtu
$(-500)
-
$
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,896
Cost:
$2,445
$3,896 25,836 - - - - - - - - $3,896
25,836
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
Tgal
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,754
Cost:
$8,000
$2,754 18,261 - - - - - - - - $2,754
18,261
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
Tgal
09: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$2,926
Cost:
$9,400
- - $1,578 79 $1,348 82 - - - - -
-
kWh
$1,578
79
MMBtu
$1,348
82
MMBtu
-
-
$
-
-
Tgal
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$775
Cost:
$1,293
- - $200 10 $575 35 - - - - -
-
kWh
$200
10
MMBtu
$575
35
MMBtu
-
-
$
-
-
Tgal
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$140
Cost:
$500
- - $100 5 $115 7 $(-75) - - - -
-
kWh
$100
5
MMBtu
$115
7
MMBtu
$(-75)
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$60,366
Cost:
$62,520
$53,075 351,959 $1,878 94 $2,038 124 $(-1,925) - $5,300 - $53,075
351,959
kWh
$1,878
94
MMBtu
$2,038
124
MMBtu
$(-1,925)
-
$
$5,300
-
Tgal
TOTAL IMPLEMENTED Savings:
$46,207
Cost:
$23,770
$44,216 293,214 $1,878 94 $2,038 124 $(-1,925) - - - $44,216
293,214
kWh
$1,878
94
MMBtu
$2,038
124
MMBtu
$(-1,925)
-
$
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $ $ Tgal
Electricity Usage Fuel Oil #1 Fuel Oil #2 Personnel Changes Water Consumption Electricity Usage Fuel Oil #1 Fuel Oil #2 Personnel Changes Water Consumption