IAC logo
IAC Assessment: WV0541
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0541
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2017
Principal Product Aluminum Galvanized Steel
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $100,000,000-$500,000,000
# of Employees 150
Plant Area (Sq.Ft.) 350,000
Annual Production 700,000 Tons
Production Hrs. Annual 8,760
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,182,083 55,344,357 kWh $0.04
Electricity Demand $1,425,639 126,840 kW-months/year $11.24
Electricity Fees $123,669 - $ -
Natural Gas $1,571,433 715,445 MMBtu $2.20
TOTAL ENERGY COSTS $5,360,904
RECOMMENDED SAVINGS* $247,387 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $58,712
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Usage Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$62,969
Cost:
$252,894
$42,951 1,090,150 $20,018 1,781 - - - - - - - - - - - - $42,951
1,090,150
kWh
$20,018
1,781
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
02: 4.126 INSTALL SENSORS TO DETECT DEFECTS Savings:
$60,138
Cost:
$100,000
$7,931 201,291 - - $2,207 1,003 - - - - - - - - $50,000 - $7,931
201,291
kWh
-
-
kW-months/year
$2,207
1,003
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
$50,000
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$40,630
Cost:
$534
$29,210 741,372 $11,420 1,016 - - - - - - - - - - - - $29,210
741,372
kWh
$11,420
1,016
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$35,042
Cost:
$29,880
$25,196 639,480 $9,846 876 - - - - - - - - - - - - $25,196
639,480
kWh
$9,846
876
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$29,320
Cost:
$72,000
$5,975 151,639 $23,345 2,077 - - - - - - - - - - - - $5,975
151,639
kWh
$23,345
2,077
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$13,353
Cost:
$1,514
$9,811 249,001 $3,833 341 - - - - - - $(-291) - - - - - $9,811
249,001
kWh
$3,833
341
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$(-291)
-
$
-
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,860
Cost:
$2,024
- - - - $3,860 1,754 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,860
1,754
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
08: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$1,206
Cost:
$5,500
- - - - - - $38 7 $(-432) (-864) $(-400) - $2,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$38
7
Tgal
$(-432)
(-864)
gal
$(-400)
-
$
$2,000
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$869
Cost:
$1,671
$622 15,776 $247 22 - - - - - - - - - - - - $622
15,776
kWh
$247
22
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$247,387
Cost:
$466,017
$121,696 3,088,709 $68,709 6,113 $6,067 2,757 $38 7 $(-432) (-864) $(-691) - $2,000 - $50,000 - $121,696
3,088,709
kWh
$68,709
6,113
kW-months/year
$6,067
2,757
MMBtu
$38
7
Tgal
$(-432)
(-864)
gal
$(-691)
-
$
$2,000
-
$
$50,000
-
$
TOTAL IMPLEMENTED Savings:
$58,712
Cost:
$5,743
$39,643 1,006,149 $15,500 1,379 $3,860 1,754 - - - - $(-291) - - - - - $39,643
1,006,149
kWh
$15,500
1,379
kW-months/year
$3,860
1,754
MMBtu
-
-
Tgal
-
-
gal
$(-291)
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $ $ $