Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2017 |
Principal Product | Aluminum Galvanized Steel |
NAICS | 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479 - Metal Coating And Allied Services |
Sales | $100,000,000-$500,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 350,000 |
Annual Production | 700,000 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,182,083 | 55,344,357 | kWh | $0.04 |
Electricity Demand | $1,425,639 | 126,840 | kW-months/year | $11.24 |
Electricity Fees | $123,669 | - | $ | - |
Natural Gas | $1,571,433 | 715,445 | MMBtu | $2.20 |
TOTAL ENERGY COSTS | $5,360,904 | |||
RECOMMENDED SAVINGS* | $247,387 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $58,712 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $62,969 Cost: $252,894 |
$42,951 | 1,090,150 | $20,018 | 1,781 | - | - | - | - | - | - | - | - | - | - | - | - |
$42,951 1,090,150 kWh |
$20,018 1,781 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.126 INSTALL SENSORS TO DETECT DEFECTS |
Savings: $60,138 Cost: $100,000 |
$7,931 | 201,291 | - | - | $2,207 | 1,003 | - | - | - | - | - | - | - | - | $50,000 | - |
$7,931 201,291 kWh |
- - kW-months/year |
$2,207 1,003 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
$50,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $40,630 Cost: $534 |
$29,210 | 741,372 | $11,420 | 1,016 | - | - | - | - | - | - | - | - | - | - | - | - |
$29,210 741,372 kWh |
$11,420 1,016 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $35,042 Cost: $29,880 |
$25,196 | 639,480 | $9,846 | 876 | - | - | - | - | - | - | - | - | - | - | - | - |
$25,196 639,480 kWh |
$9,846 876 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $29,320 Cost: $72,000 |
$5,975 | 151,639 | $23,345 | 2,077 | - | - | - | - | - | - | - | - | - | - | - | - |
$5,975 151,639 kWh |
$23,345 2,077 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $13,353 Cost: $1,514 |
$9,811 | 249,001 | $3,833 | 341 | - | - | - | - | - | - | $(-291) | - | - | - | - | - |
$9,811 249,001 kWh |
$3,833 341 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$(-291) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,860 Cost: $2,024 |
- | - | - | - | $3,860 | 1,754 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,860 1,754 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $1,206 Cost: $5,500 |
- | - | - | - | - | - | $38 | 7 | $(-432) | (-864) | $(-400) | - | $2,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$38 7 Tgal |
$(-432) (-864) gal |
$(-400) - $ |
$2,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $869 Cost: $1,671 |
$622 | 15,776 | $247 | 22 | - | - | - | - | - | - | - | - | - | - | - | - |
$622 15,776 kWh |
$247 22 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $247,387 Cost: $466,017 |
$121,696 | 3,088,709 | $68,709 | 6,113 | $6,067 | 2,757 | $38 | 7 | $(-432) | (-864) | $(-691) | - | $2,000 | - | $50,000 | - | $121,696 3,088,709 kWh |
$68,709 6,113 kW-months/year |
$6,067 2,757 MMBtu |
$38 7 Tgal |
$(-432) (-864) gal |
$(-691) - $ |
$2,000 - $ |
$50,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $58,712 Cost: $5,743 |
$39,643 | 1,006,149 | $15,500 | 1,379 | $3,860 | 1,754 | - | - | - | - | $(-291) | - | - | - | - | - | $39,643 1,006,149 kWh |
$15,500 1,379 kW-months/year |
$3,860 1,754 MMBtu |
- - Tgal |
- - gal |
$(-291) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Primary Product |