IAC Assessment: WV0542
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0542
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2017
Principal Product Scissor Lift and Aerial Lifts
NAICS 333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3531 - Construction Machinery
Sales $50,000,000-$100,000,000
# of Employees 480
Plant Area (Sq.Ft.) 325,000
Annual Production 4,000 Units
Production Hrs. Annual 7,344
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $214,186 3,441,096 kWh $0.06
Electricity Demand $28,457 7,431 kW-months/year $3.83
Electricity Fees $8,830 - $ -
Natural Gas $27,178 8,999 MMBtu $3.02
TOTAL ENERGY COSTS $313,695
RECOMMENDED SAVINGS* $47,566 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,818
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Other Liquid (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Other Liquid (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ gal $ $ $ $
01: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$9,150
Cost:
$45,000
- - - - - - - - - - $33,600 168,000 $(-16,800) - $(-7,650) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$33,600
168,000
gal
$(-16,800)
-
$
$(-7,650)
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,206
Cost:
$5,330
$4,731 76,061 $475 124 - - - - - - - - - - - - $4,731
76,061
kWh
$475
124
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,056
Cost:
$765
$4,662 74,956 $394 103 - - - - - - - - - - - - $4,662
74,956
kWh
$394
103
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
04: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$4,841
Cost:
$16,500
$3,105 49,913 $1,126 294 $610 202 - - - - - - - - - - $3,105
49,913
kWh
$1,126
294
kW-months/year
$610
202
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,681
Cost:
$2,700
- - - - $4,681 1,550 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,681
1,550
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,665
Cost:
-
$4,240 68,173 $425 111 - - - - - - - - - - - - $4,240
68,173
kWh
$425
111
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
07: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$3,828
Cost:
$1,800
$(-1,028) (-16,524) $(-103) (-27) $4,959 1,642 - - - - - - - - - - $(-1,028)
(-16,524)
kWh
$(-103)
(-27)
kW-months/year
$4,959
1,642
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,984
Cost:
$9,625
$2,551 40,998 $433 113 - - - - - - - - - - - - $2,551
40,998
kWh
$433
113
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
09: 3.4151 MINIMIZE WATER USAGE Savings:
$2,251
Cost:
$7,000
- - - - - - $1,237 245 $1,444 245 - - $(-430) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,237
245
Tgal
$1,444
245
Tgal
-
-
gal
$(-430)
-
$
-
-
$
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,131
Cost:
$883
$1,028 16,524 $103 27 - - - - - - - - - - - - $1,028
16,524
kWh
$103
27
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$963
Cost:
$940
$1,349 21,685 $114 30 - - - - - - - - - - $(-500) - $1,349
21,685
kWh
$114
30
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
$(-500)
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$955
Cost:
$2,135
$844 13,573 $111 29 - - - - - - - - - - - - $844
13,573
kWh
$111
29
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$926
Cost:
$100
$853 13,712 $73 19 - - - - - - - - - - - - $853
13,712
kWh
$73
19
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
14: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$881
Cost:
$2,150
$801 12,871 $80 21 - - - - - - - - - - - - $801
12,871
kWh
$80
21
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
15: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$48
Cost:
$105
- - - - $48 16 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$48
16
MMBtu
-
-
Tgal
-
-
Tgal
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$47,566
Cost:
$95,033
$23,136 371,942 $3,231 844 $10,298 3,410 $1,237 245 $1,444 245 $33,600 168,000 $(-17,230) - $(-8,150) - $23,136
371,942
kWh
$3,231
844
kW-months/year
$10,298
3,410
MMBtu
$1,237
245
Tgal
$1,444
245
Tgal
$33,600
168,000
gal
$(-17,230)
-
$
$(-8,150)
-
$
TOTAL IMPLEMENTED Savings:
$28,818
Cost:
$29,478
$20,258 325,682 $2,128 556 $4,681 1,550 $1,237 245 $1,444 245 - - $(-430) - $(-500) - $20,258
325,682
kWh
$2,128
556
kW-months/year
$4,681
1,550
MMBtu
$1,237
245
Tgal
$1,444
245
Tgal
-
-
gal
$(-430)
-
$
$(-500)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Other Liquid (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Other Liquid (non-haz) Personnel Changes Administrative Changes