Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2018 |
Principal Product | water |
NAICS | 221320 - Sewage Treatment Facilities |
SIC | 4941 - Water Supply |
Sales | $1,000,000-$5,000,000 |
# of Employees | 6 |
Plant Area (Sq.Ft.) | 21,442 |
Annual Production | 730,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $126,122 | 1,395,154 | kWh | $0.09 |
Natural Gas | $3,676 | 796 | MMBtu | $4.62 |
TOTAL ENERGY COSTS | $147,558 | |||
RECOMMENDED SAVINGS* | $36,414 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,855 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $17,760 Cost: $81,750 |
- | - | - | - | $17,760 | 1,611,475 | - | - |
- - kWh |
- - MMBtu |
$17,760 1,611,475 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT |
Savings: $10,332 Cost: $20,570 |
$10,332 | 114,296 | - | - | - | - | - | - |
$10,332 114,296 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $3,223 Cost: $1,000 |
$4,038 | 44,672 | - | - | - | - | $(-815) | - |
$4,038 44,672 kWh |
- - MMBtu |
- - lb |
$(-815) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,061 Cost: $1,265 |
$2,061 | 22,801 | - | - | - | - | - | - |
$2,061 22,801 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION |
Savings: $1,726 Cost: $7,488 |
$1,407 | 15,565 | $319 | 69 | - | - | - | - |
$1,407 15,565 kWh |
$319 69 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $629 Cost: $579 |
$909 | 10,051 | - | - | - | - | $(-280) | - |
$909 10,051 kWh |
- - MMBtu |
- - lb |
$(-280) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $406 Cost: $2,005 |
$406 | 4,496 | - | - | - | - | - | - |
$406 4,496 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $277 Cost: $522 |
$277 | 3,061 | - | - | - | - | - | - |
$277 3,061 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $36,414 Cost: $115,179 |
$19,430 | 214,942 | $319 | 69 | $17,760 | 1,611,475 | $(-1,095) | - | $19,430 214,942 kWh |
$319 69 MMBtu |
$17,760 1,611,475 lb |
$(-1,095) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,855 Cost: $9,589 |
$6,631 | 73,349 | $319 | 69 | - | - | $(-1,095) | - | $6,631 73,349 kWh |
$319 69 MMBtu |
- - lb |
$(-1,095) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes |