IAC Assessment: WV0560
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0560
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2018
Principal Product Rail joints
NAICS 336510 - Railroad Rolling Stock Manufacturing
SIC 3743 - Railroad Equipment
Sales $10,000,000-$50,000,000
# of Employees 37
Plant Area (Sq.Ft.) 219,000
Annual Production 30,771 Tons
Production Hrs. Annual 4,160
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $192,190 2,938,800 kWh $0.07
Electricity Demand $62,375 9,006 kW-months/year $6.93
Electricity Fees $14,805 - $ -
Natural Gas $56,779 8,692 MMBtu $6.53
TOTAL ENERGY COSTS $327,381
RECOMMENDED SAVINGS* $73,594 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,762
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes
$ kWh $ kW-months/year $ Tgal $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$43,778
Cost:
$37,964
$33,529 512,676 $10,249 1,479 - - - - - - $33,529
512,676
kWh
$10,249
1,479
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,821
Cost:
$180
$9,056 138,472 $2,765 399 - - - - - - $9,056
138,472
kWh
$2,765
399
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,930
Cost:
$8,000
$8,930 136,556 - - - - - - - - $8,930
136,556
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,154
Cost:
$80
$3,184 48,678 $970 140 - - - - - - $3,184
48,678
kWh
$970
140
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,101
Cost:
$10,000
$1,609 24,598 $492 71 - - - - - - $1,609
24,598
kWh
$492
71
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$1,679
Cost:
$1,400
- - - - $502 46 $1,232 46 $(-55) - -
-
kWh
-
-
kW-months/year
$502
46
Tgal
$1,232
46
Tgal
$(-55)
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,007
Cost:
$1,200
$1,007 15,393 - - - - - - - - $1,007
15,393
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
08: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$124
Cost:
$67
$96 1,465 $28 4 - - - - - - $96
1,465
kWh
$28
4
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$73,594
Cost:
$58,891
$57,411 877,838 $14,504 2,093 $502 46 $1,232 46 $(-55) - $57,411
877,838
kWh
$14,504
2,093
kW-months/year
$502
46
Tgal
$1,232
46
Tgal
$(-55)
-
$
TOTAL IMPLEMENTED Savings:
$20,762
Cost:
$12,860
$14,856 227,141 $4,227 610 $502 46 $1,232 46 $(-55) - $14,856
227,141
kWh
$4,227
610
kW-months/year
$502
46
Tgal
$1,232
46
Tgal
$(-55)
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes