IAC Assessment: WV0568
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0568
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2018
Principal Product Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $10,000,000-$50,000,000
# of Employees 32
Plant Area (Sq.Ft.) 400,000
Annual Production 1,006,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,754 3,133,980 kWh $0.06
Electricity Demand $42,184 5,670 kW-months/year $7.44
Electricity Fees $504 - $ -
TOTAL ENERGY COSTS $304,042
RECOMMENDED SAVINGS* $99,182 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,377
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,605
Cost:
$52,080
$11,605 195,703 - - - - - - - - $11,605
195,703
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$9,840
Cost:
$2,800
$8,397 141,598 $1,443 194 - - - - - - $8,397
141,598
kWh
$1,443
194
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$3,286
Cost:
$3,400
$3,241 54,661 $45 6 - - - - - - $3,241
54,661
kWh
$45
6
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,251
Cost:
$562
$1,411 23,788 - - - - - - $(-160) - $1,411
23,788
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$(-160)
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$73,200
Cost:
$3,000
- - - - $75,600 5,040,000 $(-2,400) - - - -
-
kWh
-
-
kW-months/year
$75,600
5,040,000
lb
$(-2,400)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$99,182
Cost:
$61,842
$24,654 415,750 $1,488 200 $75,600 5,040,000 $(-2,400) - $(-160) - $24,654
415,750
kWh
$1,488
200
kW-months/year
$75,600
5,040,000
lb
$(-2,400)
-
$
$(-160)
-
$
TOTAL IMPLEMENTED Savings:
$14,377
Cost:
$6,762
$13,049 220,047 $1,488 200 - - - - $(-160) - $13,049
220,047
kWh
$1,488
200
kW-months/year
-
-
lb
-
-
$
$(-160)
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes