IAC Assessment: WV0573
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0573
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2019
Principal Product Glass display panels
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 90,000
Annual Production 12,000,000 Units
Production Hrs. Annual 2,500
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,084 1,846,290 kWh $0.04
Electricity Demand $125,662 7,110 kW-months/year $17.67
Electricity Fees $604 - $ -
Natural Gas $70,480 9,137 MMBtu $7.71
TOTAL ENERGY COSTS $261,830
RECOMMENDED SAVINGS* $27,092 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,810
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$14,618
Cost:
$15,000
- - - - $14,618 1,896 - - -
-
kWh
-
-
kW-months/year
$14,618
1,896
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,189
Cost:
$3,000
- - - - $7,209 935 $(-20) - -
-
kWh
-
-
kW-months/year
$7,209
935
MMBtu
$(-20)
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,785
Cost:
$3,399
$513 14,537 $1,272 72 - - - - $513
14,537
kWh
$1,272
72
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,129
Cost:
$1,000
$1,129 31,974 - - - - - - $1,129
31,974
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,078
Cost:
$910
$318 9,008 $760 43 - - - - $318
9,008
kWh
$760
43
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$535
Cost:
$3,000
$535 15,142 - - - - - - $535
15,142
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$523
Cost:
$471
$223 6,307 $300 17 - - - - $223
6,307
kWh
$300
17
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$120
Cost:
$533
$103 2,911 $177 10 - - $(-160) - $103
2,911
kWh
$177
10
kW-months/year
-
-
MMBtu
$(-160)
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$115
Cost:
-
$44 1,252 $71 4 - - - - $44
1,252
kWh
$71
4
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$27,092
Cost:
$27,313
$2,865 81,131 $2,580 146 $21,827 2,831 $(-180) - $2,865
81,131
kWh
$2,580
146
kW-months/year
$21,827
2,831
MMBtu
$(-180)
-
$
TOTAL IMPLEMENTED Savings:
$10,810
Cost:
$8,313
$1,201 34,015 $2,580 146 $7,209 935 $(-180) - $1,201
34,015
kWh
$2,580
146
kW-months/year
$7,209
935
MMBtu
$(-180)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes