Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2019 |
Principal Product | Thermoset plastics |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 92,437 |
Annual Production | 17,500,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $667,339 | 9,266,614 | kWh | $0.07 |
Electricity Demand | $291,533 | 15,186 | kW-months/year | $19.20 |
Electricity Fees | $1,200 | - | $ | - |
Natural Gas | $50,360 | 8,033 | MMBtu | $6.27 |
TOTAL ENERGY COSTS | $1,023,106 | |||
RECOMMENDED SAVINGS* | $95,745 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,964 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $49,796 Cost: $9,417 |
$49,796 | 691,480 | - | - | - | - | - | - | - | - | - | - | - | - |
$49,796 691,480 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $13,935 Cost: $4,000 |
$13,935 | 193,543 | - | - | - | - | - | - | - | - | - | - | - | - |
$13,935 193,543 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $9,677 Cost: $17,920 |
- | - | $9,677 | 504 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$9,677 504 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $6,422 Cost: $11,000 |
$(-1,978) | (-27,466) | - | - | - | - | - | - | - | - | $8,400 | 8,400 | - | - |
$(-1,978) (-27,466) kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
$8,400 8,400 gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $6,104 Cost: $3,500 |
- | - | - | - | $13,004 | 2,074 | - | - | - | - | - | - | $(-6,900) | - |
- - kWh |
- - kW-months/year |
$13,004 2,074 MMBtu |
- - Tgal |
- - Tgal |
- - gal |
$(-6,900) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $5,469 Cost: $692 |
$3,783 | 52,547 | $2,054 | 107 | - | - | - | - | - | - | - | - | $(-368) | - |
$3,783 52,547 kWh |
$2,054 107 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - gal |
$(-368) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,576 Cost: $3,000 |
$1,019 | 14,150 | $557 | 29 | - | - | - | - | - | - | - | - | - | - |
$1,019 14,150 kWh |
$557 29 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4151 MINIMIZE WATER USAGE |
Savings: $1,375 Cost: $700 |
- | - | - | - | - | - | $435 | 50 | $1,025 | 50 | - | - | $(-85) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$435 50 Tgal |
$1,025 50 Tgal |
- - gal |
$(-85) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,217 Cost: $46 |
$795 | 11,048 | $422 | 22 | - | - | - | - | - | - | - | - | - | - |
$795 11,048 kWh |
$422 22 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $174 Cost: $221 |
$116 | 1,611 | $58 | 3 | - | - | - | - | - | - | - | - | - | - |
$116 1,611 kWh |
$58 3 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $95,745 Cost: $50,496 |
$67,466 | 936,913 | $12,768 | 665 | $13,004 | 2,074 | $435 | 50 | $1,025 | 50 | $8,400 | 8,400 | $(-7,353) | - | $67,466 936,913 kWh |
$12,768 665 kW-months/year |
$13,004 2,074 MMBtu |
$435 50 Tgal |
$1,025 50 Tgal |
$8,400 8,400 gal |
$(-7,353) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,964 Cost: $4,459 |
$4,694 | 65,206 | $2,534 | 132 | $13,004 | 2,074 | - | - | - | - | - | - | $(-7,268) | - | $4,694 65,206 kWh |
$2,534 132 kW-months/year |
$13,004 2,074 MMBtu |
- - Tgal |
- - Tgal |
- - gal |
$(-7,268) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Other Liquid (non-haz) | Personnel Changes |