IAC logo
IAC Assessment: WV0581
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0581
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2019
Principal Product Galvanized Steel Sheets
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3496 - Misc. Fabricated Wire Products
Sales $100,000,000-$500,000,000
# of Employees 64
Plant Area (Sq.Ft.) 128,509
Annual Production 300,000 Tons
Production Hrs. Annual 8,568
Location (State) PA
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $582,312 9,968,579 kWh $0.06
Electricity Demand $208,147 22,427 kW-months/year $9.28
Electricity Fees $(-8,830) - $ -
Natural Gas $1,101,170 286,726 MMBtu $3.84
TOTAL ENERGY COSTS $1,912,266
RECOMMENDED SAVINGS* $237,497 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,466
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$128,494
Cost:
$314,600
- - - - $128,494 33,462 - - - - - - -
-
kWh
-
-
kW-months/year
$128,494
33,462
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
02: 2.2524 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED Savings:
$37,537
Cost:
$5,500
$(-632) (-10,828) $(-139) (-15) $38,308 9,977 - - - - - - $(-632)
(-10,828)
kWh
$(-139)
(-15)
kW-months/year
$38,308
9,977
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$28,868
Cost:
$78,000
$23,616 404,838 $5,252 566 - - - - - - - - $23,616
404,838
kWh
$5,252
566
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,233
Cost:
$58,107
$13,382 229,141 $3,851 415 - - - - - - - - $13,382
229,141
kWh
$3,851
415
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$9,387
Cost:
$4,000
$9,387 160,732 - - - - - - - - - - $9,387
160,732
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
06: 3.5131 RECYCLE WHITE WATER Savings:
$8,651
Cost:
$4,100
$(-373) (-6,392) - - - - $5,743 519 $3,281 519 - - $(-373)
(-6,392)
kWh
-
-
kW-months/year
-
-
MMBtu
$5,743
519
Tgal
$3,281
519
Tgal
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,849
Cost:
$738
$4,302 73,660 $947 102 - - - - - - $(-400) - $4,302
73,660
kWh
$947
102
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$(-400)
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,540
Cost:
$100
$1,262 21,603 $278 30 - - - - - - - - $1,262
21,603
kWh
$278
30
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$938
Cost:
-
$771 13,203 $167 18 - - - - - - - - $771
13,203
kWh
$167
18
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$237,497
Cost:
$465,145
$51,715 885,957 $10,356 1,116 $166,802 43,439 $5,743 519 $3,281 519 $(-400) - $51,715
885,957
kWh
$10,356
1,116
kW-months/year
$166,802
43,439
MMBtu
$5,743
519
Tgal
$3,281
519
Tgal
$(-400)
-
$
TOTAL IMPLEMENTED Savings:
$71,466
Cost:
$145,045
$52,347 896,785 $10,495 1,131 - - $5,743 519 $3,281 519 $(-400) - $52,347
896,785
kWh
$10,495
1,131
kW-months/year
-
-
MMBtu
$5,743
519
Tgal
$3,281
519
Tgal
$(-400)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes