Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2020 |
Principal Product | Manufacturing Custom Metal |
NAICS | 332710 - Machine Shops |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 15 |
Plant Area (Sq.Ft.) | 15,000 |
Annual Production | 400,000 Units |
Production Hrs. Annual | 2,652 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $56,140 | 1,303,830 | kWh | $0.04 |
Electricity Demand | $39,839 | 2,924 | kW-months/year | $13.62 |
Natural Gas | $19,301 | 2,499 | MMBtu | $7.72 |
TOTAL ENERGY COSTS | $115,280 | |||
RECOMMENDED SAVINGS* | $14,763 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,848 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $7,138 Cost: $5,700 |
- | - | $7,138 | 525 | - | - | - | - |
- - kWh |
$7,138 525 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $2,478 Cost: $12,144 |
$1,022 | 23,708 | $1,456 | 107 | - | - | - | - |
$1,022 23,708 kWh |
$1,456 107 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,313 Cost: $6,099 |
- | - | - | - | $1,313 | 171 | - | - |
- - kWh |
- - kW-months/year |
$1,313 171 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,299 Cost: $4,225 |
$(-83) | (-1,928) | - | - | $1,382 | 179 | - | - |
$(-83) (-1,928) kWh |
- - kW-months/year |
$1,382 179 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,263 Cost: $3,355 |
$882 | 20,457 | $381 | 28 | - | - | - | - |
$882 20,457 kWh |
$381 28 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $650 Cost: $1,100 |
- | - | - | - | $778 | 98 | $(-128) | - |
- - kWh |
- - kW-months/year |
$778 98 MMBtu |
$(-128) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $315 Cost: $406 |
$199 | 4,606 | $286 | 21 | - | - | $(-170) | - |
$199 4,606 kWh |
$286 21 kW-months/year |
- - MMBtu |
$(-170) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $188 Cost: $305 |
$79 | 1,840 | $109 | 8 | - | - | - | - |
$79 1,840 kWh |
$109 8 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $119 Cost: $85 |
$51 | 1,179 | $68 | 5 | - | - | - | - |
$51 1,179 kWh |
$68 5 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,763 Cost: $33,419 |
$2,150 | 49,862 | $9,438 | 694 | $3,473 | 448 | $(-298) | - | $2,150 49,862 kWh |
$9,438 694 kW-months/year |
$3,473 448 MMBtu |
$(-298) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,848 Cost: $11,350 |
$1,211 | 28,082 | $844 | 62 | $2,091 | 269 | $(-298) | - | $1,211 28,082 kWh |
$844 62 kW-months/year |
$2,091 269 MMBtu |
$(-298) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |