IAC logo
IAC Assessment: WV0614
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0614
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2021
Principal Product Spun Yarn
NAICS 313110 - Fiber, Yarn, and Thread Mills
SIC 2281 - Yarn Spinning Mills
Sales $10,000,000-$50,000,000
# of Employees 500
Plant Area (Sq.Ft.) 361,000
Annual Production 18,200,000 Pounds
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,215,059 56,612,285 kWh $0.02
Electricity Demand $1,936,237 119,172 kW-months/year $16.25
TOTAL ENERGY COSTS $3,151,296
RECOMMENDED SAVINGS* $487,404 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,755
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$399,970
Cost:
$573,165
$149,297 6,944,063 $250,673 15,426 - - - - $149,297
6,944,063
kWh
$250,673
15,426
kW-months/year
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$37,679
Cost:
$34,222
$18,437 857,520 $19,242 1,184 - - - - $18,437
857,520
kWh
$19,242
1,184
kW-months/year
-
-
$
-
-
$
03: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$14,148
Cost:
$1,000
$8,668 403,145 $8,970 552 $(-3,490) - - - $8,668
403,145
kWh
$8,970
552
kW-months/year
$(-3,490)
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,396
Cost:
$38,385
$6,187 287,753 $7,209 444 - - - - $6,187
287,753
kWh
$7,209
444
kW-months/year
-
-
$
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$7,526
Cost:
$5,317
$3,973 184,769 $4,193 258 - - $(-640) - $3,973
184,769
kWh
$4,193
258
kW-months/year
-
-
$
$(-640)
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,463
Cost:
$2,884
$3,644 169,474 $3,819 235 - - - - $3,644
169,474
kWh
$3,819
235
kW-months/year
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,283
Cost:
$450
$1,609 74,825 $1,674 103 - - - - $1,609
74,825
kWh
$1,674
103
kW-months/year
-
-
$
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,815
Cost:
$60
$1,385 64,422 $1,430 88 - - - - $1,385
64,422
kWh
$1,430
88
kW-months/year
-
-
$
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,124
Cost:
$1,083
$555 25,824 $569 35 - - - - $555
25,824
kWh
$569
35
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$487,404
Cost:
$656,566
$193,755 9,011,795 $297,779 18,325 $(-3,490) - $(-640) - $193,755
9,011,795
kWh
$297,779
18,325
kW-months/year
$(-3,490)
-
$
$(-640)
-
$
TOTAL IMPLEMENTED Savings:
$49,755
Cost:
$49,179
$26,021 1,210,212 $27,864 1,715 $(-3,490) - $(-640) - $26,021
1,210,212
kWh
$27,864
1,715
kW-months/year
$(-3,490)
-
$
$(-640)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes