IAC Assessment: WV0616
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0616
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2021
Principal Product Hand tools
NAICS 332216 - Saw Blade and Handtool Manufacturing
SIC 3423 - Hand And Edge Tools, Nec
Sales $1,000,000-$5,000,000
# of Employees 18
Plant Area (Sq.Ft.) 40,450
Annual Production 25,000 Units
Production Hrs. Annual 2,000
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,650 294,144 kWh $0.08
Electricity Demand $22,050 2,090 kW-months/year $10.55
Electricity Fees $2,846 - $ -
Natural Gas $52,988 4,730 MMBtu $11.20
TOTAL ENERGY COSTS $102,534
RECOMMENDED SAVINGS* $20,729 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,324
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$3,763
Cost:
$7,400
- - - - $3,763 336 - - - - -
-
kWh
-
-
kW-months/year
$3,763
336
MMBtu
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,615
Cost:
$9,369
$2,075 24,758 $1,540 146 - - - - - - $2,075
24,758
kWh
$1,540
146
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,901
Cost:
$1,650
- - - - $2,901 259 - - - - -
-
kWh
-
-
kW-months/year
$2,901
259
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,796
Cost:
$399
$1,593 19,008 $1,203 114 - - - - - - $1,593
19,008
kWh
$1,203
114
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,079
Cost:
$2,877
$1,182 14,109 $897 85 - - - - - - $1,182
14,109
kWh
$897
85
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,047
Cost:
$4,500
- - $2,047 194 - - - - - - -
-
kWh
$2,047
194
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,963
Cost:
$542
$1,119 13,350 $844 80 - - - - - - $1,119
13,350
kWh
$844
80
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.1125 CONVERT TO OXYFUEL BURNERS Savings:
$980
Cost:
$4,400
- - - - $14,829 1,324 - - $(-13,849) - -
-
kWh
-
-
kW-months/year
$14,829
1,324
MMBtu
-
-
$
$(-13,849)
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$412
Cost:
$25
$233 2,778 $179 17 - - - - - - $233
2,778
kWh
$179
17
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$173
Cost:
$594
$157 1,879 $116 11 - - $(-100) - - - $157
1,879
kWh
$116
11
kW-months/year
-
-
MMBtu
$(-100)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$20,729
Cost:
$31,756
$6,359 75,882 $6,826 647 $21,493 1,919 $(-100) - $(-13,849) - $6,359
75,882
kWh
$6,826
647
kW-months/year
$21,493
1,919
MMBtu
$(-100)
-
$
$(-13,849)
-
$
TOTAL IMPLEMENTED Savings:
$10,324
Cost:
$6,087
$4,284 51,124 $3,239 307 $2,901 259 $(-100) - - - $4,284
51,124
kWh
$3,239
307
kW-months/year
$2,901
259
MMBtu
$(-100)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost