Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2022 |
Principal Product | Outdoor Sporting Goods Distribution |
NAICS | 493110 - General Warehousing and Storage |
SIC | 4225 - General Warehousing And Storage |
Sales | $50,000,000-$100,000,000 |
# of Employees | 425 |
Plant Area (Sq.Ft.) | 1,167,604 |
Annual Production | 20,000,000 Units |
Production Hrs. Annual | 8,760 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $316,606 | 5,685,300 | kWh | $0.06 |
Electricity Demand | $155,222 | 9,379 | kW-months/year | $16.55 |
Electricity Fees | $2,388 | - | $ | - |
Natural Gas | $54,599 | 23,894 | MMBtu | $2.29 |
TOTAL ENERGY COSTS | $528,815 | |||
RECOMMENDED SAVINGS* | $129,124 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $83,521 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $73,145 Cost: $29,680 |
$51,978 | 933,169 | $21,167 | 1,279 | - | - | - | - |
$51,978 933,169 kWh |
$21,167 1,279 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $28,641 Cost: $112,444 |
$(-6,489) | (-116,492) | $(-2,648) | (-160) | $37,778 | 16,497 | - | - |
$(-6,489) (-116,492) kWh |
$(-2,648) (-160) kW-months/year |
$37,778 16,497 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,687 Cost: $17,469 |
$7,523 | 135,067 | $5,164 | 312 | - | - | - | - |
$7,523 135,067 kWh |
$5,164 312 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,879 Cost: $893 |
$4,893 | 87,843 | $1,986 | 120 | - | - | - | - |
$4,893 87,843 kWh |
$1,986 120 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $3,011 Cost: $6,065 |
$2,035 | 36,543 | $976 | 59 | - | - | - | - |
$2,035 36,543 kWh |
$976 59 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,547 Cost: $2,323 |
$485 | 8,703 | $199 | 12 | $863 | 377 | - | - |
$485 8,703 kWh |
$199 12 kW-months/year |
$863 377 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $1,264 Cost: $5,280 |
- | - | - | - | $1,264 | 552 | - | - |
- - kWh |
- - kW-months/year |
$1,264 552 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $997 Cost: $120 |
$716 | 12,860 | $281 | 17 | - | - | - | - |
$716 12,860 kWh |
$281 17 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $734 Cost: $323 |
$519 | 9,317 | $215 | 13 | - | - | - | - |
$519 9,317 kWh |
$215 13 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $219 Cost: $1,027 |
$287 | 5,144 | $116 | 7 | - | - | $(-184) | - |
$287 5,144 kWh |
$116 7 kW-months/year |
- - MMBtu |
$(-184) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $129,124 Cost: $175,624 |
$61,947 | 1,112,154 | $27,456 | 1,659 | $39,905 | 17,426 | $(-184) | - | $61,947 1,112,154 kWh |
$27,456 1,659 kW-months/year |
$39,905 17,426 MMBtu |
$(-184) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $83,521 Cost: $34,366 |
$58,878 | 1,057,036 | $23,964 | 1,448 | $863 | 377 | $(-184) | - | $58,878 1,057,036 kWh |
$23,964 1,448 kW-months/year |
$863 377 MMBtu |
$(-184) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |