IAC logo
IAC Assessment: WV0628
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0628
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2022
Principal Product Water Treatment
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 80,497
Annual Production 750,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,633 1,182,926 kWh $0.06
Electricity Demand $7,405 2,635 kW-months/year $2.81
Electricity Fees $273 - $ -
LPG $10,664 397 MMBtu $26.86
Fuel Oil #1 $29,528 1,272 MMBtu $23.21
TOTAL ENERGY COSTS $121,503
RECOMMENDED SAVINGS* $67,263 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,222
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #1 Personnel Changes Electricity Usage Electricity Demand LPG Fuel Oil #1 Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$31,838
Cost:
$14,600
$(-4,635) (-74,520) $(-244) (-87) $9,585 357 $27,132 1,169 - - $(-4,635)
(-74,520)
kWh
$(-244)
(-87)
kW-months/year
$9,585
357
MMBtu
$27,132
1,169
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$15,010
Cost:
$73,174
$15,010 241,321 - - - - - - - - $15,010
241,321
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$8,049
Cost:
$1,000
$8,851 142,295 $548 195 - - - - $(-1,350) - $8,851
142,295
kWh
$548
195
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-1,350)
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,819
Cost:
$15,170
$7,271 116,898 $548 195 - - - - - - $7,271
116,898
kWh
$548
195
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,802
Cost:
$3,626
$2,639 42,425 $163 58 - - - - - - $2,639
42,425
kWh
$163
58
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,374
Cost:
$6,454
$1,293 20,784 $81 29 - - - - - - $1,293
20,784
kWh
$81
29
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$371
Cost:
$1,608
$490 7,874 $31 11 - - - - $(-150) - $490
7,874
kWh
$31
11
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-150)
-
$
TOTAL RECOMMENDED Savings:
$67,263
Cost:
$115,632
$30,919 497,077 $1,127 401 $9,585 357 $27,132 1,169 $(-1,500) - $30,919
497,077
kWh
$1,127
401
kW-months/year
$9,585
357
MMBtu
$27,132
1,169
MMBtu
$(-1,500)
-
$
TOTAL IMPLEMENTED Savings:
$11,222
Cost:
$6,234
$11,980 192,594 $742 264 - - - - $(-1,500) - $11,980
192,594
kWh
$742
264
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-1,500)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand LPG Fuel Oil #1 Personnel Changes Electricity Usage Electricity Demand LPG Fuel Oil #1 Personnel Changes