IAC logo
IAC Assessment: WV0633
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0633
IAC Center West Virginia University
Assessment Year 2022
Principal Product Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $1,000,000-$5,000,000
# of Employees 13
Plant Area (Sq.Ft.) 55,000
Annual Production 1,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,487 1,564,510 kWh $0.06
Electricity Demand $30,394 2,881 kW-months/year $10.55
Natural Gas $4,725 324 MMBtu $14.58
TOTAL ENERGY COSTS $136,606
RECOMMENDED SAVINGS* $44,237 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,877
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes By-product Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$14,598
Cost:
$23,000
$11,939 183,960 $2,659 252 - - - - - - $11,939
183,960
kWh
$2,659
252
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$13,775
Cost:
$16,600
$11,264 173,558 $2,511 238 - - - - - - $11,264
173,558
kWh
$2,511
238
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 3.6126 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR Savings:
$4,724
Cost:
$12,236
- - - - $4,724 324 - - - - -
-
kWh
-
-
kW-months/year
$4,724
324
MMBtu
-
-
$
-
-
$
04: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$4,626
Cost:
$4,080
$3,782 58,271 $844 80 - - - - - - $3,782
58,271
kWh
$844
80
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,533
Cost:
$1,543
$2,079 32,038 $454 43 - - - - - - $2,079
32,038
kWh
$454
43
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$1,637
Cost:
$5,130
$1,637 25,229 - - - - - - - - $1,637
25,229
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$1,011
Cost:
$1,500
$1,323 20,388 $295 28 - - $(-607) - - - $1,323
20,388
kWh
$295
28
kW-months/year
-
-
MMBtu
$(-607)
-
$
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$640
Cost:
$1,280
$573 8,822 $127 12 - - $(-60) - - - $573
8,822
kWh
$127
12
kW-months/year
-
-
MMBtu
$(-60)
-
$
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$447
Cost:
$1,572
- - - - $277 19 - - $170 - -
-
kWh
-
-
kW-months/year
$277
19
MMBtu
-
-
$
$170
-
$
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$246
Cost:
$878
- - - - $146 10 - - $100 - -
-
kWh
-
-
kW-months/year
$146
10
MMBtu
-
-
$
$100
-
$
TOTAL RECOMMENDED Savings:
$44,237
Cost:
$67,819
$32,597 502,266 $6,890 653 $5,147 353 $(-667) - $270 - $32,597
502,266
kWh
$6,890
653
kW-months/year
$5,147
353
MMBtu
$(-667)
-
$
$270
-
$
TOTAL IMPLEMENTED Savings:
$4,877
Cost:
$6,773
$3,975 61,248 $876 83 $423 29 $(-667) - $270 - $3,975
61,248
kWh
$876
83
kW-months/year
$423
29
MMBtu
$(-667)
-
$
$270
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes By-product Production