IAC logo
IAC Assessment: WV0634
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0634
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2022
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $50,000,000-$100,000,000
# of Employees 30
Plant Area (Sq.Ft.) 290,000
Annual Production 3,630,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $262,718 4,299,254 kWh $0.06
Electricity Demand $42,388 17,231 kW-months/year $2.46
Electricity Fees $10,297 - $ -
Fuel Oil #2 $9,200 301 MMBtu $30.56
TOTAL ENERGY COSTS $324,603
RECOMMENDED SAVINGS* $69,318 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,235
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$45,174
Cost:
$141,500
$42,812 700,694 $2,362 960 - - - - $42,812
700,694
kWh
$2,362
960
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$12,909
Cost:
$43,000
$12,235 200,244 $674 274 - - - - $12,235
200,244
kWh
$674
274
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,882
Cost:
$8,985
$8,417 137,764 $465 189 - - - - $8,417
137,764
kWh
$465
189
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,166
Cost:
$1,633
$1,247 20,413 $69 28 - - $(-150) - $1,247
20,413
kWh
$69
28
kW-months/year
-
-
MMBtu
$(-150)
-
$
05: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$973
Cost:
$1,500
$2,217 36,290 $123 50 - - $(-1,367) - $2,217
36,290
kWh
$123
50
kW-months/year
-
-
MMBtu
$(-1,367)
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$214
Cost:
$908
- - - - $214 7 - - -
-
kWh
-
-
kW-months/year
$214
7
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$69,318
Cost:
$197,526
$66,928 1,095,405 $3,693 1,501 $214 7 $(-1,517) - $66,928
1,095,405
kWh
$3,693
1,501
kW-months/year
$214
7
MMBtu
$(-1,517)
-
$
TOTAL IMPLEMENTED Savings:
$11,235
Cost:
$13,026
$11,881 194,467 $657 267 $214 7 $(-1,517) - $11,881
194,467
kWh
$657
267
kW-months/year
$214
7
MMBtu
$(-1,517)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes