Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $50,000,000-$100,000,000
# of Employees 30
Plant Area (Sq.Ft.) 290,000
Annual Production 3,630,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $262,718 4,299,254 kWh $0.06
Electricity Demand $42,388 17,231 kW-months/year $2.46
Electricity Fees $10,297 - $ -
Fuel Oil #2 $9,200 301 MMBtu $30.56
TOTAL ENERGY COSTS $324,603
RECOMMENDED SAVINGS* $69,318 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,235
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$45,174
Cost:
$141,500
$42,812 700,694 $2,362 960 - - - - $42,812
700,694
kWh
$2,362
960
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$12,909
Cost:
$43,000
$12,235 200,244 $674 274 - - - - $12,235
200,244
kWh
$674
274
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,882
Cost:
$8,985
$8,417 137,764 $465 189 - - - - $8,417
137,764
kWh
$465
189
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,166
Cost:
$1,633
$1,247 20,413 $69 28 - - $(-150) - $1,247
20,413
kWh
$69
28
kW-months/year
-
-
MMBtu
$(-150)
-
$
05: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$973
Cost:
$1,500
$2,217 36,290 $123 50 - - $(-1,367) - $2,217
36,290
kWh
$123
50
kW-months/year
-
-
MMBtu
$(-1,367)
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$214
Cost:
$908
- - - - $214 7 - - -
-
kWh
-
-
kW-months/year
$214
7
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$69,318
Cost:
$197,526
$66,928 1,095,405 $3,693 1,501 $214 7 $(-1,517) - $66,928
1,095,405
kWh
$3,693
1,501
kW-months/year
$214
7
MMBtu
$(-1,517)
-
$
TOTAL IMPLEMENTED Savings:
$11,235
Cost:
$13,026
$11,881 194,467 $657 267 $214 7 $(-1,517) - $11,881
194,467
kWh
$657
267
kW-months/year
$214
7
MMBtu
$(-1,517)
-
$