IAC logo
IAC Assessment: WV0641
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0641
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2023
Principal Product Truck Manufacturing and Assembly
NAICS 336120 - Heavy Duty Truck Manufacturing
SIC 3537 - Industrial Trucks And Tractors
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 20,300
Annual Production 110,000 Units
Production Hrs. Annual 8,064
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,329,080 17,195,517 kWh $0.08
Natural Gas $1,194,162 157,581 MMBtu $7.58
TOTAL ENERGY COSTS $2,523,242
RECOMMENDED SAVINGS* $643,194 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,155
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$235,798
Cost:
$32,000
$235,798 3,050,431 - - $235,798
3,050,431
kWh
-
-
MMBtu
02: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$189,197
Cost:
$575,150
- - $189,197 24,960 -
-
kWh
$189,197
24,960
MMBtu
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$123,784
Cost:
$178,886
$104,455 1,351,300 $19,329 2,550 $104,455
1,351,300
kWh
$19,329
2,550
MMBtu
04: 2.7262 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS Savings:
$42,136
Cost:
$4,100
$29,765 385,061 $12,371 1,632 $29,765
385,061
kWh
$12,371
1,632
MMBtu
05: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$32,260
Cost:
$112,625
- - $32,260 4,256 -
-
kWh
$32,260
4,256
MMBtu
06: 2.7314 REDUCE VENTILATION AIR Savings:
$16,843
Cost:
$4,400
- - $16,843 2,222 -
-
kWh
$16,843
2,222
MMBtu
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,857
Cost:
$5,425
$(-637) (-8,242) $2,494 329 $(-637)
(-8,242)
kWh
$2,494
329
MMBtu
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$917
Cost:
$933
- - $917 121 -
-
kWh
$917
121
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$402
Cost:
$758
- - $402 53 -
-
kWh
$402
53
MMBtu
TOTAL RECOMMENDED Savings:
$643,194
Cost:
$914,277
$369,381 4,778,550 $273,813 36,123 $369,381
4,778,550
kWh
$273,813
36,123
MMBtu
TOTAL IMPLEMENTED Savings:
$62,155
Cost:
$15,616
$29,128 376,819 $33,027 4,357 $29,128
376,819
kWh
$33,027
4,357
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas