Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2023 |
Principal Product | Truck Manufacturing and Assembly |
NAICS | 336120 - Heavy Duty Truck Manufacturing |
SIC | 3537 - Industrial Trucks And Tractors |
Sales | $50,000,000-$100,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 20,300 |
Annual Production | 110,000 Units |
Production Hrs. Annual | 8,064 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,329,080 | 17,195,517 | kWh | $0.08 |
Natural Gas | $1,194,162 | 157,581 | MMBtu | $7.58 |
TOTAL ENERGY COSTS | $2,523,242 | |||
RECOMMENDED SAVINGS* | $643,194 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $62,155 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS |
Savings: $235,798 Cost: $32,000 |
$235,798 | 3,050,431 | - | - |
$235,798 3,050,431 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $189,197 Cost: $575,150 |
- | - | $189,197 | 24,960 |
- - kWh |
$189,197 24,960 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE |
Savings: $123,784 Cost: $178,886 |
$104,455 | 1,351,300 | $19,329 | 2,550 |
$104,455 1,351,300 kWh |
$19,329 2,550 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7262 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS |
Savings: $42,136 Cost: $4,100 |
$29,765 | 385,061 | $12,371 | 1,632 |
$29,765 385,061 kWh |
$12,371 1,632 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $32,260 Cost: $112,625 |
- | - | $32,260 | 4,256 |
- - kWh |
$32,260 4,256 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7314 REDUCE VENTILATION AIR |
Savings: $16,843 Cost: $4,400 |
- | - | $16,843 | 2,222 |
- - kWh |
$16,843 2,222 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,857 Cost: $5,425 |
$(-637) | (-8,242) | $2,494 | 329 |
$(-637) (-8,242) kWh |
$2,494 329 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $917 Cost: $933 |
- | - | $917 | 121 |
- - kWh |
$917 121 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $402 Cost: $758 |
- | - | $402 | 53 |
- - kWh |
$402 53 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $643,194 Cost: $914,277 |
$369,381 | 4,778,550 | $273,813 | 36,123 | $369,381 4,778,550 kWh |
$273,813 36,123 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $62,155 Cost: $15,616 |
$29,128 | 376,819 | $33,027 | 4,357 | $29,128 376,819 kWh |
$33,027 4,357 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |