IAC Assessment: WV0646
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0646
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2023
Principal Product Medical Equipment
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 1,000,968
Annual Production 60,000 Units
Production Hrs. Annual 8,760
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $552,481 14,831,705 kWh $0.04
Electricity Demand $274,979 33,305 kW-months/year $8.26
Natural Gas $255,122 65,095 MMBtu $3.92
TOTAL ENERGY COSTS $1,082,582
RECOMMENDED SAVINGS* $271,669 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,731
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 3.4151 MINIMIZE WATER USAGE Savings:
$150,340
Cost:
$110,597
$(-657) (-17,622) - - - - $160,997 3,150 $(-10,000) - $(-657)
(-17,622)
kWh
-
-
kW-months/year
-
-
MMBtu
$160,997
3,150
Tgal
$(-10,000)
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$37,824
Cost:
$112,795
- - - - $37,824 9,649 - - - - -
-
kWh
-
-
kW-months/year
$37,824
9,649
MMBtu
-
-
Tgal
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$35,692
Cost:
$89,814
$23,005 616,748 $12,687 1,536 - - - - - - $23,005
616,748
kWh
$12,687
1,536
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER Savings:
$9,785
Cost:
$48,224
$6,308 169,112 $3,477 421 - - - - - - $6,308
169,112
kWh
$3,477
421
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,960
Cost:
$12,682
$7,143 191,488 $1,817 220 - - - - - - $7,143
191,488
kWh
$1,817
220
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$7,758
Cost:
$31,568
- - - - $7,758 1,979 - - - - -
-
kWh
-
-
kW-months/year
$7,758
1,979
MMBtu
-
-
Tgal
-
-
$
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$5,257
Cost:
$16,181
$4,035 108,185 $1,222 148 - - - - - - $4,035
108,185
kWh
$1,222
148
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,490
Cost:
$301
$2,681 71,885 $809 98 - - - - - - $2,681
71,885
kWh
$809
98
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,094
Cost:
$1,481
$2,492 66,817 $756 92 - - - - $(-154) - $2,492
66,817
kWh
$756
92
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-154)
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,040
Cost:
$9,723
$2,102 56,366 $636 77 $302 77 - - - - $2,102
56,366
kWh
$636
77
kW-months/year
$302
77
MMBtu
-
-
Tgal
-
-
$
11: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,436
Cost:
$1,807
$1,866 50,015 $570 69 - - - - - - $1,866
50,015
kWh
$570
69
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
12: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$1,904
Cost:
$1,500
$2,658 71,271 $809 98 - - - - $(-1,563) - $2,658
71,271
kWh
$809
98
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-1,563)
-
$
13: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$669
Cost:
$1,895
$661 17,725 $8 1 - - - - - - $661
17,725
kWh
$8
1
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
14: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$644
Cost:
$1,312
$347 9,297 $297 36 - - - - - - $347
9,297
kWh
$297
36
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
15: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$419
Cost:
$909
- - - - $419 107 - - - - -
-
kWh
-
-
kW-months/year
$419
107
MMBtu
-
-
Tgal
-
-
$
16: 2.2511 INSULATE BARE EQUIPMENT Savings:
$357
Cost:
$407
- - - - $357 91 - - - - -
-
kWh
-
-
kW-months/year
$357
91
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$271,669
Cost:
$441,196
$52,641 1,411,287 $23,088 2,796 $46,660 11,903 $160,997 3,150 $(-11,717) - $52,641
1,411,287
kWh
$23,088
2,796
kW-months/year
$46,660
11,903
MMBtu
$160,997
3,150
Tgal
$(-11,717)
-
$
TOTAL IMPLEMENTED Savings:
$29,731
Cost:
$53,862
$17,848 478,498 $5,066 614 $8,534 2,177 - - $(-1,717) - $17,848
478,498
kWh
$5,066
614
kW-months/year
$8,534
2,177
MMBtu
-
-
Tgal
$(-1,717)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes