IAC Assessment: WV0651
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0651
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2023
Principal Product Vending machines
NAICS 333310 - Commercial and Service Industry Machinery Manufacturing
SIC 3581 - Automatic Vending Machines
Sales $10,000,000-$50,000,000
# of Employees 94
Plant Area (Sq.Ft.) 75,100
Annual Production 434,760 Units
Production Hrs. Annual 5,250
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,752 879,240 kWh $0.06
Electricity Demand $33,957 2,302 kW-months/year $14.75
LPG $5,114 256 MMBtu $19.98
TOTAL ENERGY COSTS $87,823
RECOMMENDED SAVINGS* $20,217 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,035
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,789
Cost:
$14,056
$5,951 109,521 $4,838 328 - - $5,951
109,521
kWh
$4,838
328
kW-months/year
-
-
MMBtu
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,502
Cost:
$2,082
$1,764 31,842 $738 50 - - $1,764
31,842
kWh
$738
50
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,830
Cost:
$2,314
$1,137 20,522 $693 47 - - $1,137
20,522
kWh
$693
47
kW-months/year
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$930
Cost:
$2,863
$(-10) (-183) - - $940 47 $(-10)
(-183)
kWh
-
-
kW-months/year
$940
47
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$928
Cost:
$823
$928 16,748 - - - - $928
16,748
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$846
Cost:
$228
$521 9,410 $325 22 - - $521
9,410
kWh
$325
22
kW-months/year
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$854
Cost:
$4,011
$398 7,181 $236 16 $220 11 $398
7,181
kWh
$236
16
kW-months/year
$220
11
MMBtu
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$608
Cost:
$1,271
$283 5,107 $325 22 - - $283
5,107
kWh
$325
22
kW-months/year
-
-
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$430
Cost:
$217
$268 4,844 $162 11 - - $268
4,844
kWh
$162
11
kW-months/year
-
-
MMBtu
10: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$360
Cost:
$1,750
$227 4,095 $133 9 - - $227
4,095
kWh
$133
9
kW-months/year
-
-
MMBtu
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$140
Cost:
$656
- - - - $140 7 -
-
kWh
-
-
kW-months/year
$140
7
MMBtu
TOTAL RECOMMENDED Savings:
$20,217
Cost:
$30,271
$11,467 209,087 $7,450 505 $1,300 65 $11,467
209,087
kWh
$7,450
505
kW-months/year
$1,300
65
MMBtu
TOTAL IMPLEMENTED Savings:
$14,035
Cost:
$17,471
$7,877 144,297 $6,018 408 $140 7 $7,877
144,297
kWh
$6,018
408
kW-months/year
$140
7
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG