IAC logo
IAC Assessment: WV0657
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0657
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2024
Principal Product Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 57,111
Annual Production 12,000 Thousand Feet
Production Hrs. Annual 2,600
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $209,616 2,288,505 kWh $0.09
Electricity Demand $99,295 9,412 kW-months/year $10.55
Electricity Fees $5,800 - $ -
Other Gas $465,535 20,544 MMBtu $22.66
TOTAL ENERGY COSTS $780,246
RECOMMENDED SAVINGS* $88,039 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,356
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Gas Personnel Changes Electricity Usage Electricity Demand Other Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1224 REPLACE BOILER Savings:
$38,907
Cost:
$149,240
- - - - $38,907 1,717 - - -
-
kWh
-
-
kW-months/year
$38,907
1,717
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$21,406
Cost:
$98,076
$13,979 152,612 $7,427 704 - - - - $13,979
152,612
kWh
$7,427
704
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,019
Cost:
$3,647
$5,886 64,255 $3,133 297 - - - - $5,886
64,255
kWh
$3,133
297
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$5,370
Cost:
$18,750
- - - - $5,370 237 - - -
-
kWh
-
-
kW-months/year
$5,370
237
MMBtu
-
-
$
05: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$4,482
Cost:
$1,500
$3,469 37,866 $1,846 175 - - $(-833) - $3,469
37,866
kWh
$1,846
175
kW-months/year
-
-
MMBtu
$(-833)
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,493
Cost:
$1,302
- - - - $2,493 110 - - -
-
kWh
-
-
kW-months/year
$2,493
110
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,266
Cost:
$1,107
- - - - $2,266 100 - - -
-
kWh
-
-
kW-months/year
$2,266
100
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,181
Cost:
$1,063
$1,421 15,517 $760 72 - - - - $1,421
15,517
kWh
$760
72
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,429
Cost:
$6,850
$1,322 14,432 $707 67 - - $(-600) - $1,322
14,432
kWh
$707
67
kW-months/year
-
-
MMBtu
$(-600)
-
$
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$486
Cost:
$242
$317 3,459 $169 16 - - - - $317
3,459
kWh
$169
16
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$88,039
Cost:
$281,777
$26,394 288,141 $14,042 1,331 $49,036 2,164 $(-1,433) - $26,394
288,141
kWh
$14,042
1,331
kW-months/year
$49,036
2,164
MMBtu
$(-1,433)
-
$
TOTAL IMPLEMENTED Savings:
$22,356
Cost:
$15,711
$12,415 135,529 $6,615 627 $4,759 210 $(-1,433) - $12,415
135,529
kWh
$6,615
627
kW-months/year
$4,759
210
MMBtu
$(-1,433)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Other Gas Personnel Changes Electricity Usage Electricity Demand Other Gas Personnel Changes