IAC logo
IAC Assessment: WV0660
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0660
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2024
Principal Product Hydraulic Cylinders
NAICS 333611 - Turbine and Turbine Generator Set Units Manufacturing
SIC 3511 - Turbines And Turbine Generator Sets
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 239,483
Annual Production 120,000 Pieces
Production Hrs. Annual 6,318
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $442,427 7,224,092 kWh $0.06
Electricity Demand $161,335 15,292 kW-months/year $10.55
Natural Gas $136,755 15,121 MMBtu $9.04
TOTAL ENERGY COSTS $740,517
RECOMMENDED SAVINGS* $79,508 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$22,781
Cost:
$18,776
$13,499 216,983 $3,650 346 $5,632 623 $13,499
216,983
kWh
$3,650
346
kW-months/year
$5,632
623
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$19,324
Cost:
$10,600
$14,482 236,626 $4,842 459 - - $14,482
236,626
kWh
$4,842
459
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,000
Cost:
$9,158
$6,584 107,587 $2,416 229 - - $6,584
107,587
kWh
$2,416
229
kW-months/year
-
-
MMBtu
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$8,713
Cost:
$1,125
$2,662 43,499 $528 50 $5,523 611 $2,662
43,499
kWh
$528
50
kW-months/year
$5,523
611
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,339
Cost:
$2,225
$3,525 57,598 $954 90 $3,860 427 $3,525
57,598
kWh
$954
90
kW-months/year
$3,860
427
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,956
Cost:
$1,323
$4,500 73,526 $1,456 138 - - $4,500
73,526
kWh
$1,456
138
kW-months/year
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,033
Cost:
$2,884
$2,389 39,049 $644 61 - - $2,389
39,049
kWh
$644
61
kW-months/year
-
-
MMBtu
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,979
Cost:
$4,576
$1,557 25,439 $422 40 - - $1,557
25,439
kWh
$422
40
kW-months/year
-
-
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$383
Cost:
$104
$299 4,883 $84 8 - - $299
4,883
kWh
$84
8
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$79,508
Cost:
$50,771
$49,497 805,190 $14,996 1,421 $15,015 1,661 $49,497
805,190
kWh
$14,996
1,421
kW-months/year
$15,015
1,661
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas