IAC logo
IAC Assessment: WV0666
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0666
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2024
Principal Product Industrial Metal Buildings
NAICS 332311 - Prefabricated Metal Building and Component Manufacturing
SIC 3448 - Prefabricated Metal Buildings
Sales $10,000,000-$50,000,000
# of Employees 129
Plant Area (Sq.Ft.) 120,000
Annual Production 430 Units
Production Hrs. Annual 2,500
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,235 791,340 kWh $0.10
Electricity Demand $33,145 3,132 kW-months/year $10.58
Electricity Fees $7,727 - $ -
Natural Gas $52,766 4,404 MMBtu $11.98
TOTAL ENERGY COSTS $168,873
RECOMMENDED SAVINGS* $18,673 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$11,346
Cost:
$19,500
$1,784 18,756 $952 90 $9,860 823 $(-1,250) - $1,784
18,756
kWh
$952
90
kW-months/year
$9,860
823
MMBtu
$(-1,250)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,679
Cost:
$5,920
$3,669 38,581 $2,010 190 - - - - $3,669
38,581
kWh
$2,010
190
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$859
Cost:
$3,565
$478 5,022 $381 36 - - - - $478
5,022
kWh
$381
36
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$445
Cost:
$1,367
$340 3,578 $180 17 - - $(-75) - $340
3,578
kWh
$180
17
kW-months/year
-
-
MMBtu
$(-75)
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$260
Cost:
$640
$260 2,730 - - - - - - $260
2,730
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$84
Cost:
$100
$52 552 $32 3 - - - - $52
552
kWh
$32
3
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,673
Cost:
$31,092
$6,583 69,219 $3,555 336 $9,860 823 $(-1,325) - $6,583
69,219
kWh
$3,555
336
kW-months/year
$9,860
823
MMBtu
$(-1,325)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes