IAC Assessment: WV0670
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0670
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2024
Principal Product Vibrating (Shaker) Screens
NAICS 333131 - Mining Machinery and Equipment Manufacturing
SIC 3532 - Mining Machinery
Sales $50,000,000-$100,000,000
# of Employees 291
Plant Area (Sq.Ft.) 274,491
Annual Production 800,000 Units
Production Hrs. Annual 5,200
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $276,879 3,834,860 kWh $0.07
Electricity Demand $86,898 10,050 kW-months/year $8.65
Natural Gas $91,502 7,716 MMBtu $11.86
TOTAL ENERGY COSTS $455,279
RECOMMENDED SAVINGS* $81,999 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$39,114
Cost:
$61,425
$30,642 424,040 $8,472 979 - - - - $30,642
424,040
kWh
$8,472
979
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$15,802
Cost:
$77,610
$15,802 218,871 - - - - - - $15,802
218,871
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$10,770
Cost:
$43,200
$8,434 116,813 $2,336 270 - - - - $8,434
116,813
kWh
$2,336
270
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,001
Cost:
$13,171
$4,948 68,534 $3,053 353 - - - - $4,948
68,534
kWh
$3,053
353
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,506
Cost:
$770
$1,961 27,154 $545 63 - - - - $1,961
27,154
kWh
$545
63
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,691
Cost:
$8,244
$1,172 16,232 $519 60 - - - - $1,172
16,232
kWh
$519
60
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,211
Cost:
$1,154
$951 13,174 $260 30 - - - - $951
13,174
kWh
$260
30
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,123
Cost:
$1,296
$1,230 17,034 $337 39 - - $(-444) - $1,230
17,034
kWh
$337
39
kW-months/year
-
-
MMBtu
$(-444)
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$878
Cost:
$581
- - - - $878 74 - - -
-
kWh
-
-
kW-months/year
$878
74
MMBtu
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$666
Cost:
$148
$519 7,188 $147 17 - - - - $519
7,188
kWh
$147
17
kW-months/year
-
-
MMBtu
-
-
$
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$237
Cost:
$1,029
- - - - $237 20 - - -
-
kWh
-
-
kW-months/year
$237
20
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$81,999
Cost:
$208,628
$65,659 909,040 $15,669 1,811 $1,115 94 $(-444) - $65,659
909,040
kWh
$15,669
1,811
kW-months/year
$1,115
94
MMBtu
$(-444)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes