IAC logo
IAC Assessment: WV0675
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0675
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2024
Principal Product Commercial Screen Printing
NAICS 323113 - Commercial Screen Printing
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 189
Plant Area (Sq.Ft.) 225,000
Annual Production 500,000 Units
Production Hrs. Annual 6,240
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $229,051 3,435,403 kWh $0.07
Electricity Demand $218,881 14,185 kW-months/year $15.43
Electricity Fees $5,197 - $ -
LPG $33,968 1,995 MMBtu $17.03
TOTAL ENERGY COSTS $487,097
RECOMMENDED SAVINGS* $216,725 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Electricity Usage Electricity Demand Electricity Fees LPG
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$163,920
Cost:
$663,966
$117,445 1,760,790 $46,475 3,021 - - - - $117,445
1,760,790
kWh
$46,475
3,021
kW-months/year
-
-
$
-
-
MMBtu
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$24,663
Cost:
$80,657
$18,445 276,544 $6,218 403 - - - - $18,445
276,544
kWh
$6,218
403
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,514
Cost:
$29,651
$8,656 129,768 $3,858 250 - - - - $8,656
129,768
kWh
$3,858
250
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,065
Cost:
$25,395
$4,013 60,164 $2,052 133 - - - - $4,013
60,164
kWh
$2,052
133
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,602
Cost:
$252
$1,801 26,999 $801 52 - - - - $1,801
26,999
kWh
$801
52
kW-months/year
-
-
$
-
-
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,934
Cost:
$4,653
- - - - $1,934 - - - -
-
kWh
-
-
kW-months/year
$1,934
-
$
-
-
MMBtu
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,456
Cost:
$6,768
$1,194 17,904 $262 17 - - - - $1,194
17,904
kWh
$262
17
kW-months/year
-
-
$
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,305
Cost:
$1,422
$474 7,106 $508 33 - - $323 19 $474
7,106
kWh
$508
33
kW-months/year
-
-
$
$323
19
MMBtu
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,087
Cost:
$3,439
$871 13,064 $216 14 - - - - $871
13,064
kWh
$216
14
kW-months/year
-
-
$
-
-
MMBtu
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$664
Cost:
$1,243
$463 6,940 $201 13 - - - - $463
6,940
kWh
$201
13
kW-months/year
-
-
$
-
-
MMBtu
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$515
Cost:
$26
$361 5,408 $154 10 - - - - $361
5,408
kWh
$154
10
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$216,725
Cost:
$817,472
$153,723 2,304,687 $60,745 3,946 $1,934 - $323 19 $153,723
2,304,687
kWh
$60,745
3,946
kW-months/year
$1,934
-
$
$323
19
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees LPG Electricity Usage Electricity Demand Electricity Fees LPG