IAC logo
IAC Assessment: WV0676
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0676
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2024
Principal Product Masonry
NAICS 327331 - Concrete Block and Brick Manufacturing
SIC 3251 - Brick And Structural Clay Tile
Sales $10,000,000-$50,000,000
# of Employees 53
Plant Area (Sq.Ft.) 100,000
Annual Production 40,000 Tons
Production Hrs. Annual 2,080
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $167,633 3,257,534 kWh $0.05
Electricity Demand $198,481 12,020 kW-months/year $16.51
Electricity Fees $8,828 - $ -
Natural Gas $831,065 305,539 MMBtu $2.72
TOTAL ENERGY COSTS $1,206,007
RECOMMENDED SAVINGS* $82,153 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$64,709
Cost:
$86,472
- - - - $64,709 23,878 - - - - -
-
kWh
-
-
kW-months/year
$64,709
23,878
MMBtu
-
-
$
-
-
$
02: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$4,780
Cost:
$5,200
$5,484 106,494 $4,689 284 - - $(-5,393) - - - $5,484
106,494
kWh
$4,689
284
kW-months/year
-
-
MMBtu
$(-5,393)
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,750
Cost:
$6,504
$2,802 54,415 $1,948 118 - - - - - - $2,802
54,415
kWh
$1,948
118
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,482
Cost:
$1,197
$1,234 23,961 $2,278 138 - - - - $(-30) - $1,234
23,961
kWh
$2,278
138
kW-months/year
-
-
MMBtu
-
-
$
$(-30)
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,075
Cost:
$3,893
$999 19,409 $1,076 65 - - - - - - $999
19,409
kWh
$1,076
65
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,979
Cost:
$653
$691 13,424 $1,288 78 - - - - - - $691
13,424
kWh
$1,288
78
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$329
Cost:
$1,415
$131 2,547 $198 12 - - - - - - $131
2,547
kWh
$198
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$49
Cost:
$140
$16 304 $33 2 - - - - - - $16
304
kWh
$33
2
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$82,153
Cost:
$105,474
$11,357 220,554 $11,510 697 $64,709 23,878 $(-5,393) - $(-30) - $11,357
220,554
kWh
$11,510
697
kW-months/year
$64,709
23,878
MMBtu
$(-5,393)
-
$
$(-30)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost