IAC Assessment: WV0680
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0680
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2025
Principal Product Conveyor Accessories
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3532 - Mining Machinery
Sales $50,000,000-$100,000,000
# of Employees 321
Plant Area (Sq.Ft.) 96,411
Annual Production 650,000 Pounds
Production Hrs. Annual 8,736
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $231,324 3,044,576 kWh $0.08
Electricity Demand $79,764 7,610 kW-months/year $10.48
Electricity Fees $16,668 - $ -
Natural Gas $58,839 4,964 MMBtu $11.85
TOTAL ENERGY COSTS $386,595
RECOMMENDED SAVINGS* $123,484 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$71,035
Cost:
$115,528
$57,757 759,960 $13,278 1,267 - - $57,757
759,960
kWh
$13,278
1,267
kW-months/year
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$19,535
Cost:
$2,495
$15,437 201,112 $4,098 391 - - $15,437
201,112
kWh
$4,098
391
kW-months/year
-
-
MMBtu
03: 2.7314 REDUCE VENTILATION AIR Savings:
$13,841
Cost:
$6,504
- - - - $13,841 1,168 -
-
kWh
-
-
kW-months/year
$13,841
1,168
MMBtu
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$9,835
Cost:
$33,120
$7,770 102,231 $2,065 197 - - $7,770
102,231
kWh
$2,065
197
kW-months/year
-
-
MMBtu
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,106
Cost:
$5,245
$1,561 20,543 $545 52 - - $1,561
20,543
kWh
$545
52
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,628
Cost:
$5,289
$1,104 14,523 $524 50 - - $1,104
14,523
kWh
$524
50
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,360
Cost:
$4,307
$957 12,593 $403 38 - - $957
12,593
kWh
$403
38
kW-months/year
-
-
MMBtu
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,314
Cost:
$1,343
$1,314 17,292 - - - - $1,314
17,292
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,296
Cost:
$5,010
$471 6,196 $126 12 $699 59 $471
6,196
kWh
$126
12
kW-months/year
$699
59
MMBtu
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,146
Cost:
$1,082
$905 11,907 $241 23 - - $905
11,907
kWh
$241
23
kW-months/year
-
-
MMBtu
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$388
Cost:
$424
$304 4,001 $84 8 - - $304
4,001
kWh
$84
8
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$123,484
Cost:
$180,347
$87,580 1,150,358 $21,364 2,038 $14,540 1,227 $87,580
1,150,358
kWh
$21,364
2,038
kW-months/year
$14,540
1,227
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas