Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2025 |
Principal Product | Cold-formed steel building products |
NAICS | 332322 - Sheet Metal Work Manufacturing |
SIC | 3441 - Fabricated Structural Metal |
Sales | $10,000,000-$50,000,000 |
# of Employees | 97 |
Plant Area (Sq.Ft.) | 307,420 |
Annual Production | 7,221,082 Pounds |
Production Hrs. Annual | 4,160 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $187,464 | 5,837,184 | kWh | $0.03 |
Electricity Demand | $90,976 | 11,249 | kW-months/year | $8.09 |
Electricity Fees | $42,349 | - | $ | - |
Natural Gas | $125,579 | 33,933 | MMBtu | $3.70 |
TOTAL ENERGY COSTS | $446,368 | |||
RECOMMENDED SAVINGS* | $63,334 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $18,599 Cost: $24,000 |
$10,768 | 335,462 | $7,831 | 968 | - | - | - | - | - | - |
$10,768 335,462 kWh |
$7,831 968 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,123 Cost: $9,580 |
$5,706 | 177,772 | $4,417 | 546 | - | - | - | - | - | - |
$5,706 177,772 kWh |
$4,417 546 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $9,267 Cost: $13,716 |
$5,287 | 164,698 | $3,980 | 492 | - | - | - | - | - | - |
$5,287 164,698 kWh |
$3,980 492 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $6,295 Cost: $24,800 |
$3,828 | 119,251 | $2,467 | 305 | - | - | - | - | - | - |
$3,828 119,251 kWh |
$2,467 305 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $5,215 Cost: $5,557 |
$3,071 | 95,661 | $2,144 | 265 | - | - | - | - | - | - |
$3,071 95,661 kWh |
$2,144 265 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $4,913 Cost: $21,336 |
- | - | - | - | $(-1,554) | (-420) | $(-3,033) | - | $9,500 | - |
- - kWh |
- - kW-months/year |
$(-1,554) (-420) MMBtu |
$(-3,033) - $ |
$9,500 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,391 Cost: $10,040 |
$2,466 | 76,820 | $1,925 | 238 | - | - | - | - | - | - |
$2,466 76,820 kWh |
$1,925 238 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM |
Savings: $1,612 Cost: $1,500 |
$1,412 | 43,991 | $1,027 | 127 | - | - | $(-827) | - | - | - |
$1,412 43,991 kWh |
$1,027 127 kW-months/year |
- - MMBtu |
$(-827) - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,242 Cost: $743 |
$837 | 26,068 | $405 | 50 | - | - | - | - | - | - |
$837 26,068 kWh |
$405 50 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,229 Cost: $5,827 |
$953 | 29,694 | $696 | 86 | - | - | $(-420) | - | - | - |
$953 29,694 kWh |
$696 86 kW-months/year |
- - MMBtu |
$(-420) - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $245 Cost: $70 |
$164 | 5,099 | $81 | 10 | - | - | - | - | - | - |
$164 5,099 kWh |
$81 10 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $203 Cost: $673 |
$138 | 4,313 | $65 | 8 | - | - | - | - | - | - |
$138 4,313 kWh |
$65 8 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $63,334 Cost: $117,842 |
$34,630 | 1,078,829 | $25,038 | 3,095 | $(-1,554) | (-420) | $(-4,280) | - | $9,500 | - | $34,630 1,078,829 kWh |
$25,038 3,095 kW-months/year |
$(-1,554) (-420) MMBtu |
$(-4,280) - $ |
$9,500 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption |