IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 111 Crop Production
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2318 # 01 Y:2023 01 2023 RECOVER AND REUSE COOLING WATER $345,363 $28,215 Implemented
UW2318 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $67 $180 Implemented
UW2318 # 03 Y:2023 03 2023 UPGRADE OBSOLETE EQUIPMENT $376 $5,862 Not Implemented
UW2314 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,331 $2,251 Not Implemented
UW2314 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $701 $3,150 Implemented
UW2314 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $96 $180 Implemented
UW2313 # 01 Y:2023 01 2023 RECOVER AND REUSE COOLING WATER $513,763 $28,215 Implemented
UW2313 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,760 $2,080 Implemented
UW2313 # 03 Y:2023 03 2023 UPGRADE OBSOLETE EQUIPMENT $2,813 $10,637 Implemented
CO0743 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $9,876 $84,276 n/a
CO0743 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $9,304 $42,082 n/a
CO0743 # 03 Y:2022 03 2022 INSTALL SPECTRAL REFLECTORS / DELAMP $2,506 $9,960 n/a
CO0743 # 04 Y:2022 04 2022 RECOVER AND REUSE WASTE MATERIAL $1,718 $4,820 n/a
CO0743 # 05 Y:2022 05 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,800 $26,000 n/a
OR0720 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,138 $3,275 Not Implemented
OR0720 # 04 Y:2019 04 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,139 $2,013 Not Implemented
OR0720 # 03 Y:2019 03 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,330 $1,100 Implemented
OR0720 # 01 Y:2019 01 2019 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $27,061 $33,855 Not Implemented
OR0720 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $31,433 $68,000 Implemented
UU0127 # 03 Y:2018 03 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,880 $0 Not Implemented
UU0127 # 02 Y:2018 02 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,553 $55,000 Not Implemented
UU0127 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $177,817 $2,000 Implemented
DL0120 # 07 Y:2014 07 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $44,085 $50,000 Not Implemented
DL0120 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,260 $300 Implemented
DL0120 # 08 Y:2014 08 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $52,252 $500,000 Not Implemented