Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
14
matching recommendationsNAICS | 11133 | Noncitrus Fruit and Tree Nut Farming |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2318 # 01 Y:2023 | 01 | 2023 | RECOVER AND REUSE COOLING WATER | $345,363 | $28,215 | Implemented |
UW2318 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $67 | $180 | Implemented |
UW2318 # 03 Y:2023 | 03 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $376 | $5,862 | Not Implemented |
UW2314 # 01 Y:2023 | 01 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,331 | $2,251 | Not Implemented |
UW2314 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $701 | $3,150 | Implemented |
UW2314 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $96 | $180 | Implemented |
UW2313 # 01 Y:2023 | 01 | 2023 | RECOVER AND REUSE COOLING WATER | $513,763 | $28,215 | Implemented |
UW2313 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,760 | $2,080 | Implemented |
UW2313 # 03 Y:2023 | 03 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $2,813 | $10,637 | Implemented |
OR0720 # 01 Y:2019 | 01 | 2019 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $27,061 | $33,855 | Not Implemented |
OR0720 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $31,433 | $68,000 | Implemented |
OR0720 # 03 Y:2019 | 03 | 2019 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,330 | $1,100 | Implemented |
OR0720 # 04 Y:2019 | 04 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,139 | $2,013 | Not Implemented |
OR0720 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,138 | $3,275 | Not Implemented |