IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
NAICS 112 Animal Production and Aquaculture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0392 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,327 $5,642 Not Implemented
SF0411 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,097 $504 Implemented
SF0411 # 03 Y:2012 03 2012 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $716 $0 Implemented
SF0411 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,666 $1,200 Implemented
SF0411 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,104 $6,660 Not Implemented
SF0411 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,094 $939 Implemented
SF0411 # 07 Y:2012 07 2012 USE MULTIPLE-EFFECT EVAPORATORS $14,245 $17,433 Not Implemented
SF0411 # 08 Y:2012 08 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,723 $3,965 Not Implemented
SF0411 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,671 $11,216 Not Implemented
SF0411 # 10 Y:2012 10 2012 INSTALL OCCUPANCY SENSORS $18,497 $47,901 Implemented
SF0411 # 11 Y:2012 11 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,227 $3,774 Not Implemented
SF0411 # 12 Y:2012 12 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,986 $135,330 Implemented
SF0411 # 01 Y:2012 01 2012 COMBINE UTILITY METERS $35,266 $0 Implemented
OR0576 # 01 Y:2011 01 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $10,860 $1,000 Implemented
OR0576 # 03 Y:2011 03 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $764 $4,960 Not Implemented
OR0576 # 02 Y:2011 02 2011 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $109,290 $104,251 Not Implemented
UW0031 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,305 $6,000 Not Implemented
UW0031 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,928 $19,446 Not Implemented
UW0031 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $1,741 $5,500 Not Implemented
UW0031 # 04 Y:2009 04 2009 INSULATE BARE EQUIPMENT $144 $61 Not Implemented
UM0283 # 05 Y:2005 05 2005 AIR CONDITION ONLY SPACE NECESSARY $793 $2,117 Not Implemented
UM0283 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,024 $300 Implemented
UM0283 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $873 $3,000 Not Implemented
UM0283 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,568 $6,878 Implemented
UM0283 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,056 $2,500 Implemented