IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
NAICS 1121 Cattle Ranching and Farming
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0372 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $996 $691 Not Implemented
AS0369 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $219 $79 Not Implemented
AS0369 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $155 $240 Implemented
AS0369 # 05 Y:2004 05 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $749 $3,500 Implemented
AS0369 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $988 $0 Not Implemented
AS0369 # 03 Y:2004 03 2004 USE SOLAR HEAT TO HEAT WATER $1,305 $1,740 Not Implemented
AS0369 # 02 Y:2004 02 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,848 $10,300 Not Implemented
AS0369 # 01 Y:2004 01 2004 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $33,626 $16,440 Not Implemented
AS0366 # 06 Y:2004 06 2004 USE SOLAR HEAT TO HEAT WATER $468 $1,730 Not Implemented
AS0366 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,140 $60 Implemented
AS0366 # 02 Y:2004 02 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,700 $18,000 Not Implemented
AS0366 # 01 Y:2004 01 2004 ADD ADDITIONAL PRODUCTION SHIFT $66,315 $18,116 Not Implemented
AS0366 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,660 $7,180 Not Implemented
AS0366 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $353 $1,640 Implemented
AS0366 # 07 Y:2004 07 2004 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $468 $1,150 Not Implemented
AS0366 # 05 Y:2004 05 2004 INSTALL AN UNINTERUPTABLE POWER SUPPLY $1,275 $573 Implemented
AS0357 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $304 $350 Not Implemented
AS0357 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $158 $159 Not Implemented
AS0357 # 01 Y:2003 01 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,658 $5,500 Not Implemented