IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
Reset
NAICS 2123 Nonmetallic Mineral Mining and Quarrying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0355 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,340 $30,000 Not Implemented
NC0355 # 04 Y:2007 04 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,252 $20,000 Not Implemented
NC0355 # 05 Y:2007 05 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,131 $1,000 Not Implemented
SD0384 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $199,400 $80,665 Not Implemented
SD0384 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $184,174 $85,865 Not Implemented
SD0384 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $115,354 $45,825 Not Implemented
SD0384 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,082 $13,481 Not Implemented
SD0384 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,401 $0 Not Implemented
SD0384 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,242 $5,792 Not Implemented
BD0312 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $61,556 $162,010 Not Implemented
BD0312 # 02 Y:2006 02 2006 USE SYNTHETIC LUBRICANT $16,661 $10,500 Not Implemented
BD0312 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,668 $0 Not Implemented
AS0379 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,855 $60 n/a
AS0379 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $771 $18 n/a
AS0379 # 03 Y:2004 03 2004 INSTALL EQUIPMENT TO MOVE PRODUCT $32,901 $159,000 n/a
AS0379 # 04 Y:2004 04 2004 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $49,440 $190,300 n/a
AS0379 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,661 $1,885 n/a
AS0379 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $882 $3,715 n/a
SU0177 # 01 Y:2004 01 2004 PAY UTILITY BILLS ON TIME $691 $0 Implemented
SU0177 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $85 $0 Not Implemented
SU0177 # 03 Y:2004 03 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $319,380 $270,000 Implemented
SU0177 # 04 Y:2004 04 2004 USE SYNTHETIC LUBRICANT $1,396 $1,000 Implemented
SU0177 # 05 Y:2004 05 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,711 $134,000 Not Implemented
OR0445 # 01 Y:2003 01 2003 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $123,700 $303,000 n/a
OR0445 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,860 $5,450 Implemented