IAC logo
IAC Assessment: AS0379
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0379
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2004
Principal Product Sand and Gravel
NAICS 212321 - Construction Sand and Gravel Mining
SIC 1442 - Construction Sand And Gravel
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 1,000,000
Annual Production 2,500,000 Tons
Production Hrs. Annual 5,060
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,410 1,941,900 kWh $0.06
Electricity Demand $21,360 10,680 kW-months/year $2.00
Other Gas $260,259 27,610 MMBtu $9.43
TOTAL ENERGY COSTS $406,029
RECOMMENDED SAVINGS* $90,510 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,855
Cost:
$60
$4,521 70,444 $334 167 - - - - - - - - $4,521
70,444
kWh
$334
167
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$771
Cost:
$18
$718 11,195 $53 26 - - - - - - - - $718
11,195
kWh
$53
26
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$32,901
Cost:
$159,000
$(-303,336) (-4,726,392) $(-22,416) (-11,208) - - $182,160 19,734 $176,493 - - - $(-303,336)
(-4,726,392)
kWh
$(-22,416)
(-11,208)
kW-months/year
-
-
MMBtu
$182,160
19,734
MMBtu
$176,493
-
$
-
-
$
04: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE Savings:
$49,440
Cost:
$190,300
$79,778 1,243,042 $5,896 2,948 $(-36,234) (-6,039) - - - - - - $79,778
1,243,042
kWh
$5,896
2,948
kW-months/year
$(-36,234)
(-6,039)
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,661
Cost:
$1,885
$1,547 24,106 $114 58 - - - - - - - - $1,547
24,106
kWh
$114
58
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$882
Cost:
$3,715
$796 12,401 $72 36 - - - - - - $14 - $796
12,401
kWh
$72
36
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$14
-
$
TOTAL RECOMMENDED Savings:
$90,510
Cost:
$354,978
$(-215,976) (-3,365,204) $(-15,947) (-7,973) $(-36,234) (-6,039) $182,160 19,734 $176,493 - $14 - $(-215,976)
(-3,365,204)
kWh
$(-15,947)
(-7,973)
kW-months/year
$(-36,234)
(-6,039)
MMBtu
$182,160
19,734
MMBtu
$176,493
-
$
$14
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Ancillary Material Cost