Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2004 |
Principal Product | Sand and Gravel |
NAICS | 212321 - Construction Sand and Gravel Mining |
SIC | 1442 - Construction Sand And Gravel |
Sales | $1,000,000-$5,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 1,000,000 |
Annual Production | 2,500,000 Tons |
Production Hrs. Annual | 5,060 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $124,410 | 1,941,900 | kWh | $0.06 |
Electricity Demand | $21,360 | 10,680 | kW-months/year | $2.00 |
Other Gas | $260,259 | 27,610 | MMBtu | $9.43 |
TOTAL ENERGY COSTS | $406,029 | |||
RECOMMENDED SAVINGS* | $90,510 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,855 Cost: $60 |
$4,521 | 70,444 | $334 | 167 | - | - | - | - | - | - | - | - |
$4,521 70,444 kWh |
$334 167 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $771 Cost: $18 |
$718 | 11,195 | $53 | 26 | - | - | - | - | - | - | - | - |
$718 11,195 kWh |
$53 26 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $32,901 Cost: $159,000 |
$(-303,336) | (-4,726,392) | $(-22,416) | (-11,208) | - | - | $182,160 | 19,734 | $176,493 | - | - | - |
$(-303,336) (-4,726,392) kWh |
$(-22,416) (-11,208) kW-months/year |
- - MMBtu |
$182,160 19,734 MMBtu |
$176,493 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE |
Savings: $49,440 Cost: $190,300 |
$79,778 | 1,243,042 | $5,896 | 2,948 | $(-36,234) | (-6,039) | - | - | - | - | - | - |
$79,778 1,243,042 kWh |
$5,896 2,948 kW-months/year |
$(-36,234) (-6,039) MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,661 Cost: $1,885 |
$1,547 | 24,106 | $114 | 58 | - | - | - | - | - | - | - | - |
$1,547 24,106 kWh |
$114 58 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $882 Cost: $3,715 |
$796 | 12,401 | $72 | 36 | - | - | - | - | - | - | $14 | - |
$796 12,401 kWh |
$72 36 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
$14 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $90,510 Cost: $354,978 |
$(-215,976) | (-3,365,204) | $(-15,947) | (-7,973) | $(-36,234) | (-6,039) | $182,160 | 19,734 | $176,493 | - | $14 | - | $(-215,976) (-3,365,204) kWh |
$(-15,947) (-7,973) kW-months/year |
$(-36,234) (-6,039) MMBtu |
$182,160 19,734 MMBtu |
$176,493 - $ |
$14 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Gas | Personnel Changes | Ancillary Material Cost |