IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
NAICS 221 Utilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0143 # 03 Y:2020 03 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $68,374 $200,000 Not Implemented
BS0143 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $11 $25 Not Implemented
BS0143 # 01 Y:2020 01 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,379 $1,225,000 Not Implemented
BS0119 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $20 Not Implemented
BS0119 # 03 Y:2019 03 2019 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,022 $30 Not Implemented
BS0119 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $165 Not Implemented
BS0119 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $36 $30 Not Implemented
BS0116 # 04 Y:2019 04 2019 USE EXISTING DAM TO GENERATE ELECTRICITY $437 $6,000 Not Implemented
BS0116 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $8,150 $166,500 Not Implemented
BS0116 # 03 Y:2019 03 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,158 $13,685 Not Implemented
BS0116 # 02 Y:2019 02 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,415 $1,176 Not Implemented
BS0116 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $113 $50 Implemented
BS0029 # 01 Y:2014 01 2014 INCREASE EFFICIENCY OF TRUCKS $19,366 $24,000 Not Implemented
BS0029 # 06 Y:2014 06 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,602 $33,371 Not Implemented
BS0029 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,677 $726 Not Implemented
BS0029 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $275 $29 Not Implemented
BS0029 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,130 $3,375 Not Implemented
BS0029 # 02 Y:2014 02 2014 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $57,736 $307,920 Not Implemented