Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
84
matching recommendationsNAICS | 2213 | Water, Sewage and Other Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0164 # 03 Y:2020 | 03 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $865 | $2,038 | Not Implemented |
UU0164 # 04 Y:2020 | 04 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $750 | $750 | Not Implemented |
UU0164 # 05 Y:2020 | 05 | 2020 | USE RADIANT HEATER FOR SPOT HEATING | $245 | $540 | Not Implemented |
UU0163 # 07 Y:2020 | 07 | 2020 | ADOPT IN-HOUSE MATERIAL GENERATION | $10,477 | $5,000 | Implemented |
UU0163 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,414 | $15,055 | Implemented |
UU0163 # 05 Y:2020 | 05 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,576 | $2,000 | Implemented |
UU0163 # 04 Y:2020 | 04 | 2020 | OPTIMIZE PLANT POWER FACTOR | $4,707 | $8,012 | Not Implemented |
UU0163 # 03 Y:2020 | 03 | 2020 | ADOPT IN-HOUSE MATERIAL GENERATION | $11,324 | $5,000 | Implemented |
UU0163 # 02 Y:2020 | 02 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $29,850 | $1,200 | Not Implemented |
UU0163 # 01 Y:2020 | 01 | 2020 | USE EXISTING DAM TO GENERATE ELECTRICITY | $38,699 | $100,000 | Not Implemented |
UU0162 # 02 Y:2020 | 02 | 2020 | UPGRADE OBSOLETE EQUIPMENT | $5,390 | $7,024 | Not Implemented |
UU0162 # 01 Y:2020 | 01 | 2020 | REDUCE FLUID FLOW RATES | $8,259 | $17,871 | Implemented |
UU0162 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,096 | $5,759 | Implemented |
UU0162 # 04 Y:2020 | 04 | 2020 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $328 | $1,141 | Implemented |
UU0155 # 03 Y:2019 | 03 | 2019 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $898 | $1,650 | Implemented |
UU0155 # 02 Y:2019 | 02 | 2019 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $14,015 | $46,625 | Not Implemented |
UU0155 # 01 Y:2019 | 01 | 2019 | ADOPT IN-HOUSE MATERIAL GENERATION | $102,278 | $823,000 | Implemented |
UU0153 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $5,443 | $502 | Not Implemented |
UU0153 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $48,728 | $423,632 | Not Implemented |
UU0153 # 02 Y:2019 | 02 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $14,902 | $205,000 | Implemented |
UU0153 # 03 Y:2019 | 03 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $22,776 | $146,977 | Not Implemented |
UU0153 # 05 Y:2019 | 05 | 2019 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $2,777 | $6,500 | Implemented |
UU0153 # 06 Y:2019 | 06 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $899 | $2,019 | Implemented |
UU0153 # 07 Y:2019 | 07 | 2019 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,444 | $400 | Implemented |
UU0141 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $3,778 | $1,225 | Implemented |