IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,253

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0732 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,880 $15,310 Implemented
MA0732 # 04 Y:2014 04 2014 AIR CONDITION ONLY SPACE NECESSARY $849 $4,000 Not Implemented
MA0731 # 01 Y:2014 01 2014 USE EXISTING DAM TO GENERATE ELECTRICITY $17,926 $250,000 Not Implemented
MA0731 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,649 $3,000 Not Implemented
MA0731 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,813 $5,000 Implemented
MA0731 # 04 Y:2014 04 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $729 $300 Not Implemented
DL0130 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,000 $1,000 Not Implemented
DL0130 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,689 $88,625 Implemented
DL0130 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $800 $200 Implemented
DL0130 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,400 $800 Implemented
DL0130 # 05 Y:2014 05 2014 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,400 $8,400 Implemented
OR0627 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $28,066 $0 Implemented
OR0627 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $54,087 $0 Implemented
OR0627 # 03 Y:2014 03 2014 CHANGE OPERATING CONDITIONS $30,875 $0 Implemented
OR0627 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,799 $1,000 Implemented
OR0627 # 05 Y:2014 05 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $21,245 $23,300 Not Implemented
OR0627 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,770 $22,011 Not Implemented
OR0627 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $10,323 $17,350 Implemented
OR0627 # 08 Y:2014 08 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $32,937 $129,750 Not Implemented
OR0627 # 09 Y:2014 09 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,631 $4,602 Not Implemented
OR0627 # 10 Y:2014 10 2014 USE PHOTOCELL CONTROLS $3,741 $7,191 Implemented
OR0627 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,856 $39,597 Implemented
BS0029 # 01 Y:2014 01 2014 INCREASE EFFICIENCY OF TRUCKS $19,366 $24,000 Not Implemented
BS0029 # 02 Y:2014 02 2014 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $57,736 $307,920 Not Implemented
BS0029 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,130 $3,375 Not Implemented