IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0176 # 02 Y:2023 02 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,592 $1,946 Not Implemented
IP0176 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $540 $0 Not Implemented
MUWT03 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $314 $395 Not Implemented
MUWT03 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152 $350 Not Implemented
IP0176 # 03 Y:2023 03 2023 USE RADIANT HEATER FOR SPOT HEATING $4,356 $5,979 Not Implemented
MUWT03 # 01 Y:2023 01 2023 USE PHOTOCELL CONTROLS $81 $532 Not Implemented
IP0175 # 03 Y:2023 03 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $22,456 $24,300 Not Implemented
IP0175 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $30,222 $6,500 Not Implemented
IP0175 # 01 Y:2023 01 2023 USE OPTIMUM TEMPERATURE $452 $0 Not Implemented
MUWT02 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $294 $0 Not Implemented
MUWT02 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98 $20 Not Implemented
MUWT02 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,011 $15,399 Not Implemented
IP0153 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,112 $6,705 Not Implemented
IP0153 # 04 Y:2021 04 2021 MAINTAIN MACHINES TO REDUCE LEAKS $36,991 $130,160 Not Implemented
IP0153 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $73 $128 Not Implemented
IP0153 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,018 $53 Not Implemented
IP0143 # 01 Y:2020 01 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $233 $0 Implemented
IP0143 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,901 $48 Implemented
IP0143 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,444 $143 Not Implemented
IP0143 # 10 Y:2020 10 2020 INSULATE BARE EQUIPMENT $27,535 $79,808 Not Implemented
IP0143 # 04 Y:2020 04 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,298 $420 Implemented
IP0143 # 05 Y:2020 05 2020 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $474 $461 Not Implemented
IP0143 # 06 Y:2020 06 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $50,956 $54,000 Not Implemented
IP0143 # 07 Y:2020 07 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,059 $1,227 Implemented
IP0143 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,338 $16,716 Implemented