IAC Assessment: IP0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2020
Principal Product Waste Water Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 6,500,000
Annual Production 42,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,208,203 76,528,314 kWh $0.03
Electricity Demand $3,061,389 131,786 kW-months/year $23.23
Electricity Fees $(-121,858) - $ -
Natural Gas $865,098 410,930 MMBtu $2.11
TOTAL ENERGY COSTS $6,012,832
RECOMMENDED SAVINGS* $214,743 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,829
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$233
Cost:
-
$111 3,828 $122 5 - - - - $111
3,828
kWh
$122
5
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,901
Cost:
$48
$906 31,256 $995 43 - - - - $906
31,256
kWh
$995
43
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,444
Cost:
$143
$4,444 153,237 - - - - - - $4,444
153,237
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,298
Cost:
$420
$113 3,906 - - - - $3,185 1,513 $113
3,906
kWh
-
-
kW-months/year
-
-
$
$3,185
1,513
MMBtu
05: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$474
Cost:
$461
- - - - $474 - - - -
-
kWh
-
-
kW-months/year
$474
-
$
-
-
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$50,956
Cost:
$54,000
- - - - - - $50,956 24,207 -
-
kWh
-
-
kW-months/year
-
-
$
$50,956
24,207
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,059
Cost:
$1,227
$427 14,733 $632 27 - - - - $427
14,733
kWh
$632
27
kW-months/year
-
-
$
-
-
MMBtu
08: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$118,506
Cost:
$210,000
$118,506 4,086,423 - - - - - - $118,506
4,086,423
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,338
Cost:
$16,716
$2,616 90,206 $3,722 160 - - - - $2,616
90,206
kWh
$3,722
160
kW-months/year
-
-
$
-
-
MMBtu
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$27,535
Cost:
$79,808
- - - - - - $27,535 13,081 -
-
kWh
-
-
kW-months/year
-
-
$
$27,535
13,081
MMBtu
TOTAL RECOMMENDED Savings:
$214,743
Cost:
$362,823
$127,124 4,383,590 $5,470 235 $474 - $81,676 38,801 $127,124
4,383,590
kWh
$5,470
235
kW-months/year
$474
-
$
$81,676
38,801
MMBtu
TOTAL IMPLEMENTED Savings:
$12,829
Cost:
$18,411
$4,174 143,929 $5,470 235 - - $3,185 1,513 $4,174
143,929
kWh
$5,470
235
kW-months/year
-
-
$
$3,185
1,513
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas