Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
621
matching recommendationsNAICS | 22131 | Water Supply and Irrigation Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0722 # 03 Y:2014 | 03 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,147 | $9,900 | Not Implemented |
MA0722 # 04 Y:2014 | 04 | 2014 | REDUCE VENTILATION AIR | $2,443 | $3,000 | Not Implemented |
MA0722 # 05 Y:2014 | 05 | 2014 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,818 | $2,750 | Not Implemented |
MA0722 # 06 Y:2014 | 06 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,742 | $1,450 | Not Implemented |
MA0722 # 07 Y:2014 | 07 | 2014 | REDUCE VENTILATION AIR | $1,630 | $3,750 | Not Implemented |
MA0722 # 08 Y:2014 | 08 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $998 | $200 | Implemented |
MA0722 # 09 Y:2014 | 09 | 2014 | PAY UTILITY BILLS ON TIME | $949 | $500 | Not Implemented |
MA0722 # 10 Y:2014 | 10 | 2014 | INSTALL OCCUPANCY SENSORS | $599 | $1,600 | Not Implemented |
SD0476 # 01 Y:2013 | 01 | 2013 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $78,108 | $360,000 | Not Implemented |
SD0476 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,282 | $33,000 | Implemented |
SD0476 # 03 Y:2013 | 03 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $6,115 | $200 | Not Implemented |
SD0476 # 04 Y:2013 | 04 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,485 | $13,830 | Implemented |
SD0476 # 05 Y:2013 | 05 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,573 | $6,995 | Implemented |
MA0709 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,306 | $74,300 | Not Implemented |
MA0709 # 02 Y:2013 | 02 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $15,578 | $162,500 | Not Implemented |
MA0709 # 03 Y:2013 | 03 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,963 | $60,000 | Not Implemented |
MA0709 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $588 | $200 | Implemented |
MA0698 # 01 Y:2012 | 01 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,300 | $1,000 | Not Implemented |
MA0698 # 02 Y:2012 | 02 | 2012 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $8,226 | $6,500 | Not Implemented |
MA0698 # 03 Y:2012 | 03 | 2012 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,992 | $28,000 | Not Implemented |
MA0698 # 04 Y:2012 | 04 | 2012 | REDESIGN PROCESS | $7,448 | $22,500 | Not Implemented |
MA0698 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,082 | $4,410 | Not Implemented |
MA0698 # 06 Y:2012 | 06 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,103 | $5,900 | Not Implemented |
MA0698 # 07 Y:2012 | 07 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,076 | $9,870 | Not Implemented |
SD0451 # 01 Y:2012 | 01 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $35,395 | $14,332 | Implemented |