IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2014 |
Principal Product | Drinking water |
NAICS | 221310 - Water Supply and Irrigation Systems |
SIC | 4941 - Water Supply |
Sales | $10,000,000-$50,000,000 |
# of Employees | 6 |
Plant Area (Sq.Ft.) | 74,000 |
Annual Production | 5,456,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $237,081 | 3,497,760 | kWh | $0.07 |
Electricity Demand | $93,194 | 6,101 | kW-months/year | $15.28 |
Electricity Fees | $949 | - | $ | - |
Fuel Oil #2 | $106,420 | 3,787 | MMBtu | $28.10 |
TOTAL ENERGY COSTS | $437,644 | |||
RECOMMENDED SAVINGS* | $35,564 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,296 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Administrative Changes | Electricity Usage | Electricity Demand | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $11,298 Cost: $500 |
- | - | $10,616 | 695 | - | - | $682 | - |
- - kWh |
$10,616 695 kW-months/year |
- - MMBtu |
$682 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $10,940 Cost: $1,500 |
$10,940 | 161,357 | - | - | - | - | - | - |
$10,940 161,357 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $3,147 Cost: $9,900 |
- | - | - | - | $3,147 | 112 | - | - |
- - kWh |
- - kW-months/year |
$3,147 112 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7314 REDUCE VENTILATION AIR |
Savings: $2,443 Cost: $3,000 |
$55 | 816 | - | - | $2,388 | 85 | - | - |
$55 816 kWh |
- - kW-months/year |
$2,388 85 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $1,818 Cost: $2,750 |
$160 | 2,369 | - | - | $1,658 | 59 | - | - |
$160 2,369 kWh |
- - kW-months/year |
$1,658 59 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,742 Cost: $1,450 |
- | - | - | - | $1,742 | 62 | - | - |
- - kWh |
- - kW-months/year |
$1,742 62 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7314 REDUCE VENTILATION AIR |
Savings: $1,630 Cost: $3,750 |
- | - | - | - | $1,630 | 58 | - | - |
- - kWh |
- - kW-months/year |
$1,630 58 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $998 Cost: $200 |
$998 | 14,717 | - | - | - | - | - | - |
$998 14,717 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $949 Cost: $500 |
- | - | - | - | - | - | $949 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$949 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $599 Cost: $1,600 |
$599 | 8,830 | - | - | - | - | - | - |
$599 8,830 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,564 Cost: $25,150 |
$12,752 | 188,089 | $10,616 | 695 | $10,565 | 376 | $1,631 | - | $12,752 188,089 kWh |
$10,616 695 kW-months/year |
$10,565 376 MMBtu |
$1,631 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,296 Cost: $700 |
$998 | 14,717 | $10,616 | 695 | - | - | $682 | - | $998 14,717 kWh |
$10,616 695 kW-months/year |
- - MMBtu |
$682 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Administrative Changes | Electricity Usage | Electricity Demand | Fuel Oil #2 | Administrative Changes |